Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 250059
Vendor/Entity Legal Name (if applicable): HGS, LLC dba RES Environmental Operating Company, LLC
MWBE Contracted Goal (if applicable): 14.70%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of only bid to HGS, LLC dba RES Environmental Operating Company, LLC in the amount of $1,053,985 for construction of floating vegetated islands at Rev. William and Audrey Lawson Stormwater Detention Basin for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250059), MWBE Contracted Goal: 14.70%.
end
Background and Discussion:
The project area is in Southeastern Harris County within Precinct 1 inside the of Unincorporated Houston at Clear Creek Watershed. The goal of the Floating Vegetated Islands is to provide the environmental stormwater quality benefits to the existing Stormwater Detention Basin Project (A500-08-00-E002). This is design was completed by B2Z Engineering team. The construction of the proposed vegetated island is funded by the 2018 Bond (C-05).
Expected Impact:
The objective of this project is to enhance stormwater quality to the Clear Creek Channel, HCFCD Unit A100-00-00. Continuation of CIP efforts to improve conveyance capabilities for the Harris County Drainage Infrastructure of existing assets and newly planned work.
Resultant in reduction of flooding and proper drainage of the Hunting Bayou Watershed flood waters in
this region.
Alternative Options:
There is no alternative option for this project.
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complete and implement the Flood Resilience Plan.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
01/30/2024 |
2019-24 |
Agreement BGE |
03/27/2025 |
563 |
Advertisement Letter Approved |
Location: N/A
Address (if applicable): N/A
Precinct(s): Countywide
Fiscal and Personnel Summary |
Service Name |
Construction of Floating Vegetated Islands at Rev. William and Audrey Lawson Stormwater Detention Basin for the Harris County Flood Control District |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Other |
$ |
$1,053,984.87 |
$1,053,984.87 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$1,053,984.87 |
$1,053,984.87 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$1,053,984.87 |
$1,053,984.87 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 6/12/2025
Anticipated Implementation Date (if different from Court date): 7/1/2025
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Rashaun Jones., Project Manager, Engineering Div.; Lyndsey Bars, Senior Buyer, Purchasing
Attachments (if applicable): Letter