Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Grant - Amendment
Project ID (if applicable): D111-00-00-C002
Vendor/Entity Legal Name (if applicable): Texas Division of Emergency Management
MWBE Contracted Goal (if applicable):
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): 0%
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept an amendment to an agreement with the Texas Division of Emergency Management to extend the grant end date to April 1, 2028, for the FEMA Pre-Disaster Mitigation grant (Brays Bayou Watershed, Bond ID C-12, Project ID D111-00-00-C002, Precinct 1).
end
Background and Discussion:
This grant award amendment will continue to provide financial and technical assistance to the Flood Control District for structural reconstruction of Poor Farm Ditch (Project ID D111‑00‑00), a tributary to Brays Bayou, to replace the deteriorated concrete channel and restore design capacity to reduce flood risk for adjacent communities. The project includes completion of final design, bidding, and construction of approximately 3,100 linear feet of new channel within existing HCFCD right‑of‑way, delivered in coordination with the Cities of Southside Place, West University Place, and the City of Houston. The amendment extends the period of performance to April 1, 2028.
Expected Impact:
This grant amendment will allow the Flood Control District to continue progress on the Poor Farm Ditch Improvement Project by extending the period of performance with no change in funding. The additional time will support the schedule needed to complete construction. Once constructed, the planned improvements are anticipated to reduce flood risk within the Poor Farm Ditch watershed by increasing conveyance and supporting more effective operation of adjacent stormwater detention facilities.
The Flood Control District will utilize its resources and applicable consultants throughout the project, as well as manage all grant compliance activities in accordance with Harris County statutes, Texas state law, and Policy regarding Federal Grant Awards.
Alternative Options:
The alternatives are: 1) not to accept the grant amendment, wherein awarded unused grant funding would be returned to FEMA at the end of the existing period of performance on September 13, 2026, and the project would lose funding, or 2) the project’s engineering and construction will need to be funded entirely with local funding.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: This action is consistent with the Strategic Plan's overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
09/19/2023 |
246. |
Grant Application |
|
03/26/2024 |
296. |
Grant Award |
Location: Along the Poor Farm Ditch between University Boulevard and Bellaire Boulevard, situated between the cities of West University Place and Southside Place.
Address (if applicable):
Precinct(s): Precinct 1
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/12/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order, Grant Amendment Letter