Legislation Details

File #: 25-7150    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 10/29/2025 In control: Commissioners Court
On agenda: 11/13/2025 Final action: 11/13/2025
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills at 10130 1/2 Blackhawk Boulevard Houston, Texas, 77089 (Intersection of Blackhawk Boulevard and Southbluff Boulevard) for electrical power serving a traffic signal, UPIN 23102MF2QV01, Precinct 2.
Attachments: 1. 25-7150-SOLs - 10130 1-2 Blackhawk Blvd - SKETCH UPDATE

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): UPIN 23102MF2QV01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills at 10130 ½ Blackhawk Boulevard Houston, Texas, 77089 (Intersection of Blackhawk Boulevard and Southbluff Boulevard) for electrical power serving a traffic signal, UPIN 23102MF2QV01, Precinct 2.

end

 

Background and Discussion:

Rebuilding a traffic signal at the intersection of Blackhawk Boulevard and Southbluff Boulevard is a project that aims to enhanced traffic movements at the existing intersection. The service outlet location statement is needed to establish electrical service from CenterPoint Energy Houston Electric, LLC to power the traffic signal.

 

Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy Houston Electric, LLC to provide electrical service to the traffic signal, which is needed to enhance operations at the intersection of Blackhawk Boulevard and Southbluff Boulevard.

 

Alternative Options:

All traffic signals require a power source, which is typically obtained through CenterPoint Energy Houston Electric, LLC.  Alternative options are to place a generator, which is not reliable, or to not install traffic signals at the intersection. Both options will negatively impact operations and increase delay of the intersection.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/19/2022

78

Request for Approval to Negotiate with LJA Engineering, Inc.

12/13/2022

56

Request for Approval to Execute a Professional Services  Agreement with LJA Engineering, Inc.

9/19/2023

66

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC

 

Location:

Address (if applicable): 10130 ½ Blackhawk Boulevard, Houston, TX, 77089

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Traffic Engineering and Operations

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund: 1000 / Dept: 10203003 / Account: 619040

$

$0

$0

$0

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$0

$0

$0

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$0

$0

$0

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/13/2025

Anticipated Implementation Date (if different from Court date): n/a

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief, Engineering & Architectural Services, OCE

 

Attachments (if applicable): Updated SOLS