Legislation Details

File #: 24-4559    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 7/21/2024 In control: Commissioners Court
On agenda: 8/6/2024 Final action: 8/6/2024
Title: Request for approval to negotiate with Lockwood, Andrews & Newnam, Inc for the design and construction of a mast arm in connection with Traffic Signal - Boudreaux Road and Shaw Road, UPIN 24104MF3H001, Precinct 4.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): UPIN - 24104MF3H001

Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with Lockwood, Andrews & Newnam, Inc for the design and construction of a mast arm in connection with Traffic Signal - Boudreaux Road and Shaw Road, UPIN 24104MF3H001, Precinct 4.

end

 

Background and Discussion:

Traffic signals are installed to improve the operation of an intersection and better facilitate pedestrian activities. As such, the consultant will be tasked with the signal design of the intersection to improve operations. The consultant will be tasked with evaluating pedestrian accessibility through the provision of crosswalks and associated adjustments required to facilitate pedestrian activities.

 

 

Expected Impact:

This location currently operates as a minor street stop-controlled intersection. An alternative is to not signalize the intersection, which will not provide operational and pedestrian benefits.

 

 

Alternative Options:

This location currently operates as a minor street stop-controlled intersection. An alternative is to not signalize the intersection, which will not provide operational and pedestrian benefits.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Boudreaux Road and Shaw Road in Cypress, Texas 77429

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Traffic signal services - Consultant

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 6, 2024

 

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure,

Harris County Engineering Department

 

Attachments (if applicable): N/A