File #: 25-5676    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 9/2/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval to execute an agreement with Agility Engineering and Management Inc., in the amount of $1,595,220.61 for Professional Engineering Services in connection with Roadway Improvements - Clay Road-Porter Road to Katy Hockley Cut Off Road - 2025, UPIN 25104MF3UQ01, Precinct 4, MWBE Contracted Goal: 19.55%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 25104MF3UQ01

Vendor/Entity Legal Name (if applicable): Agility Engineering and Management Inc

 

MWBE Contracted Goal (if applicable): 19.55%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Agility Engineering and Management Inc., in the amount of $1,595,220.61 for Professional Engineering Services in connection with Roadway Improvements - Clay Road-Porter Road to Katy Hockley Cut Off Road - 2025, UPIN 25104MF3UQ01, Precinct 4, MWBE Contracted Goal: 19.55%.

end

 

Background and Discussion:

The County wishes to execute an agreement with Agility Engineering and Management Inc., to conduct the study and design for improvements to Clay Road from Porter Road to Katy Hockley Cut-off Road.  The total length of the project is approximately 1.2 miles and consists of replacing the existing Two Lane Road with a Four Lane Concrete Boulevard, with sidewalks, curb and gutters, detention basin and a storm sewer system. Also, the existing signal at Katy Hockley Cutoff Road will be improved.

 

Expected Impact:

This project would provide a standard roadway along Clay Road which will handle the demands of the current and future traffic volumes. The improvement will alleviate congestion, reduce delays, and provide safe mobility for residents, pedestrians, and drivers in Northwest Katy. This project improves the existing roads enhancing and the mobility options for the motorized and non-motorized modes, safer and more efficient connectivity and in addition, providing better drainage system for the surrounding communities; followed by developing improvement to address the safety, and mobility to each location to provide safer travel.

 

Alternative Options:

If no action is taken, the residents and road users will not benefit from the mobility and drainage improvements.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G2: Implement designated corridors (e.g., HOV, BRT, truck lanes) in road design.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

N/A

 

 

 

Location: Katy, TX

Address (if applicable): N/A

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

(3109)

Existing Budget

 

 

 

 

Other

$

$1,595,220.61

$1,595,220.61

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,595,220.61

$1,595,220.61

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,595,220.61

$1,595,220.61

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement