Legislation Details

File #: 26-7031    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/13/2026 In control: Commissioners Court
On agenda: 10/29/2026 Final action: 10/29/2026
Title: Request for approval of a change in contract with Environmental Allies Inc., in connection with final construction of Park and Road Improvements - Eisenhower Park – 2024, adding 34 calendar days, with an addition in the amount of $55,924.25, Job No. 25/0409-1, UPIN 25101MF3RN01, Precinct 1, MWBE Contracted Goal: 17.04%, MWBE Current Participation: 4.14%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0409, UPIN 25101MF3RN01

Vendor/Entity Legal Name (if applicable): Environmental Allies Inc.

 

MWBE Contracted Goal (if applicable): 17.04%

MWBE Current Participation (if applicable): 4.14%

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Environmental Allies Inc., in connection with final construction of Park and Road Improvements - Eisenhower Park - 2024, adding 34 calendar days, with an addition in the amount of $55,924.25, Job No. 25/0409-1, UPIN 25101MF3RN01, Precinct 1, MWBE Contracted Goal: 17.04%, MWBE Current Participation: 4.14%.

end

 

Background and Discussion:          

The project consists of roadway reconstruction and drainage improvements within Eisenhower Park in Harris County Precinct 1. The purpose of the project is to enhance public safety and improve the overall quality of life by rehabilitating the existing roadway pavement and upgrading the drainage infrastructure. These improvements will provide better driving conditions, improve pedestrian safety, and mitigate drainage issues for residents and park visitors.

 

The change in contract includes the following:


The line items are adjusted to reconcile overrun, underrun quantities and add new line items on the project for completion of the proposed scope of work.

 

•         The increase in quantities due to overruns of existing line item numbers 5, 6, 9, 10, 13, 15, 16, 17, 18, 19, 20, 22, 26, 32, 33, 37, 39, 40, and 44 results in an addition of $231,586.07.

 

•         The decrease in quantities due to underruns of existing line item numbers 1, 3, 4, 8, 11, 12, 14, 15, 16, 17, 18, 21, 24, 36, 41 and 42 results in a deduction of $186,201.38.

 

New Line Items:

 

•         Added line Item 43 - Backfill Pavement Edge with Flowable Fill for an addition in the amount of $5,959.56 and zero (0) calendar days.

 

•         Added line Item 44 - Install Sod, Complete in Place for an addition in the amount of $4,580.00 and zero (0) calendar days.

 

The above additions and deductions result in a deduction in the amount of $55,924.25 and thirty-four (34) calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage through roadway reconstruction and drainage improvements within Eisenhower Park.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/08/2026

337 (26-0099)

Transmittal - Advertisement

01/29/2026

214 (26-0658)

Contract Award - Environmental Allies, LLC

07/30/2026

181 (26-4713)

Transmittal - Substantial Completion

 

Location: Park and Road Improvements - Eisenhower Park - 2024

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper 3109

$

$55,924.25

$55,924.25

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$55,924.25

$55,924.25

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$55,924.25

$55,924.25

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/29/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC) - Final