Legislation Details

File #: 24-4044    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/28/2024 In control: Commissioners Court
On agenda: 7/15/2024 Final action: 7/15/2024
Title: Request for approval to negotiate an agreement with R.G. Miller Engineers, Inc., to provide preliminary engineering, design, bidding, and construction phase engineering services in support of the Cypresswood and Jones Road Stormwater Detention Basin. (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-05-00-E001, Precinct 3).
Attachments: 1. 071524 ATN RG MILLER 2024-48 PCT 3 map.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): K500-05-00-E001

Vendor/Entity Legal Name (if applicable): R.G. Miller Engineers, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate an agreement with R.G. Miller Engineers, Inc., to provide preliminary engineering, design, bidding, and construction phase engineering services in support of the Cypresswood and Jones Road Stormwater Detention Basin. (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-05-00-E001, Precinct 3).

end

 

Background and Discussion:

The proposed project is located at the Cypress Creek Watershed along channel K100-00-00, East of the intersection of Grant Road and Jones Road. The recommended alternative from a Cypress Creek Program Implementation Plan (K100-00-00-P007), helps to mitigate overland sheet flow, overbank flooding, insufficient drainage capacity, overflows from neighboring catchments, and tailwater influence from Sims Bayou. This project occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

 

Expected Impact:

The project will reduce flood risk and strengthen resiliency in the Cypress Creek watershed by alleviating property and structural damage to adjacent communities. 

 

Alternative Options:

They are no viable alternative to the requested item.  If this project is not approved for PER, existing conditions would not be improved, and the flood risk would remain the same.  

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: July 15, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map