Legislation Details

File #: 25-5014    Version: 1 Name:
Type: Grant Status: Passed
File created: 8/4/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Request by the Office of the County Engineer for approval of a grant resolution with the intent to execute an Advance Funding Agreement with the Texas Department of Transportation for the Surface Transportation Block Grant Program (STBG) for the Asphalt Package Project - Louetta Road in Precinct 3.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Resolution

 

Project ID (if applicable): Asphalt Package Project - Louetta Road

Vendor/Entity Legal Name (if applicable): Texas Department of Transportation

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): Infrastructure (Design, Construction, Maintenance)

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval of a grant resolution with the intent to execute an Advance Funding Agreement with the Texas Department of Transportation for the Surface Transportation Block Grant Program (STBG) for the Asphalt Package Project - Louetta Road in Precinct 3.

end

 

Background and Discussion:

The Surface Transportation Block Grant Program (STBG) promotes flexibility in State and local transportation decisions and provides funding to address State and local transportation needs. Harris County Office of the County Engineer (OCE) is submitting a request seeking a resolution to authorize the STBG Program funds allocation by Houston-Galveston Area Council for the utilization of pavement repair and new roadway signage identified as the asphalt project - a critical safety project.  The grant award is for a total of $19,440,000 in federal funding and there is no local match. The preservation of critical infrastructure is vital to improve the condition, reliability, and resilience of County transportation. Connecting our communities to safe, reliable, equitably distributed, and well- maintained infrastructure is paramount.

 

Expected Impact:

Pavement repair and new roadway signage of the asphalt project facilitates intermodal connections between emerging transportation technologies as a provision of safe, connected, and improved infrastructure.

 

Alternative Options:

If the project does not receive federal funds, the proposed project may have to be constructed with local funds.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

 250

Approved to submit the grant application for the Precinct 3 Asphalt Package Project.

 

Location:

Address (if applicable): Louetta Road, Champion Forest Road to West of Interstate 45

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Surface Transportation Block Grant Program (STBG)

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$19,440,000

$19,440,000

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/26/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Planning and Transportation, Harris County Engineering Department

 

Attachments (if applicable): Budget, Project Description, Notice of Award, Court Order, Resolution, AFA