Legislation Details

File #: 26-1792    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/6/2026 In control: Commissioners Court
On agenda: 3/19/2026 Final action: 3/19/2026
Title: Request for approval of an award on the basis of low bid meeting specifications to MetroCity LLC in the amount of $526,425 for construction of a water distribution system along Cheswick Drive for Precinct 2, and for the County Clerk to execute any applicable bonds to be received (250410), MWBE Contracted Goal: 19.17%.
Attachments: 1. 26-1792 Award Job No. 250410 MetroCity LLC.pdf

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250410

Vendor/Entity Legal Name (if applicable): MetroCity LLC

 

MWBE Contracted Goal (if applicable): 19.17%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid meeting specifications to MetroCity LLC in the amount of $526,425 for construction of a water distribution system along Cheswick Drive for Precinct 2, and for the County Clerk to execute any applicable bonds to be received (250410), MWBE Contracted Goal: 19.17%.

end

 

Background and Discussion:

Construction of a new water distribution system and service connections to eligible residents along Cheswick Drive including plugging water wells. Project is one phase of a multi-phase program that builds upon previous phases to bring public water to areas where residents use water wells, which are shallow and contamination prone. City of Houston will own and operate the system after construction.

 

Expected Impact:

Connect residential properties to the newly installed water distribution system to provide reliable quality drinking water and fire hydrants.

 

Alternative Options:

Continue the use of water wells that are prone to contamination.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

9-18-25

55

Approved to execute an Interlocal Agreement with Airline Improvement District to provide leverage funding for a Community Development Block Grant Funded project, Water Distribution System - Cheswick Drive

11-13-25

110

Approval of 5 Community Development Block Grant Entitlement (CDBG-EN) funded agreements with 1) Harris County Precinct 3 for Runneburg Estates Road Improvements project total allocation of $972,436; 2) Harris County Water Control and Improvement District No. 21 for Drinking Water Pump Station Improvements project total allocation of $472,170; 3) Harris County Precinct 2 for Cheswick Drive Water Distribution System project total allocation of $1,128,036; 4) Harris County Water Control and Improvement District No. 74 for Sanitary Sewer Improvements project total allocation of $555,582; and 5) Sheldon Road Municipal Utility District for Water Line Improvements project total allocation of $722,309.

01/29/2026

279

Transmittal by Purchasing of a project scheduled for advertisement

 

Location:

Address (if applicable): Cheswick Drive

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$526,425.00

$526,425.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$526,425.00

$526,425.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$526,425.00

$526,425.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 3/19/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Award Documents