Legislation Details

File #: 26-7505    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/30/2026 In control: Commissioners Court
On agenda: 11/12/2026 Final action: 11/12/2026
Title: Request for approval of a change in contract with SER Construction Partners LLC, in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, with a deduction in the amount of $3,568.45, Job No. 24/0358-02, Infrastructure Fund, UPIN 19101MF14202, Precinct 2, MWBE Contracted Goal: 35.60%, MWBE Current Participation: 38.81%.
Sponsors: Mony Hossain
Attachments: 1. 26-7505-CIC-UPIN 19101MF14202-Pine Trails 1-2-5-6-24-0358-02-PO-104175-SER-P2-vCC.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0358, UPIN 19101MF14202

Vendor/Entity Legal Name (if applicable): SER Construction Partners LLC

 

MWBE Contracted Goal (if applicable): 35.60%

MWBE Current Participation (if applicable): 38.81%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with SER Construction Partners LLC, in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, with a deduction in the amount of $3,568.45, Job No. 24/0358-02, Infrastructure Fund, UPIN 19101MF14202, Precinct 2, MWBE Contracted Goal: 35.60%, MWBE Current Participation: 38.81%.

end

 

Background and Discussion:

Pine Trails Subdivision is in Northeast Harris County, Texas, Precinct 2 (redistricted from Precinct 1). Phases 1 and 2 are located on the Northwest and Southwest side of the Pine Trails subdivision respectively. The subdivision consists of approximately 525 acres and 1,800 homes. The residents have experienced structural flooding during several recent flood events. Approximately 264 homes were reported to have flooded during Hurricane Harvey. Proposed improvements include an upgraded storm sewer system and two detention basins. This contract includes construction services for the construction phase.

 

The change in contract includes the following:

 

The line items are adjusted to reconcile overrun and underrun quantities for completion of the proposed scope of work.

 

•         The decrease of quantities on existing line item 172 for a deduction in the amount of $178,542.00.

 

•         The increase of quantities on existing line items 153, 155, 157 and 163 for an increase in the amount of $163,573.20 and 0 calendar days.

 

New line item added:

 

•         Added new line-item number 222 -“Provide & Install 12 inch x 17 inch x 12 inch Plastic Water Meter Boxes” for an addition in the amount of $11,400.35 and zero (0) calendar days.

 

The above changes result in a deduction in the amount of $3,568.45 and zero (0) calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Pine Trails Subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

415 (24-6850)

Transmittal - Advertisement

12/10/2024

355 (24-7524)

Contract Award - SER Construction Partners LLC

07/30/2026

28 (26-4780)

Contract Amendment (24/0358-1) for a deduction in funds and extension of project term - Infrastructure Fund

08/06/2026

51 (26-5105)

Contract Amendment (24/0358-1) for an addition in funds and deduction in project term - Grant Fund

 

Location: Pine Trails subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

-$3,568.45

-$3,568.45

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$3,568.45

-$3,568.45

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$3,568.45

-$3,568.45

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC)