Title: Request for approval of a change in contract with Sprint Sand & Clay, LLC, in connection with final construction of Wortham Estates Subdivision Drainage Improvements, adding 88 calendar days, with a deduction in the amount of $109,194.32, Job No. 24/0237-2, UPIN 19103MF15701, Precinct 3, MWBE Contracted Goal: 30.79%, MWBE Current Participation: 67.10%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0237, UPIN 19103MF15701

Vendor/Entity Legal Name (if applicable): Sprint Sand & Clay, LLC

 

MWBE Contracted Goal (if applicable): 30.79%

MWBE Current Participation (if applicable): 67.10%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sprint Sand & Clay, LLC, in connection with final construction of Wortham Estates Subdivision Drainage Improvements, adding 88 calendar days, with a deduction in the amount of $109,194.32, Job No. 24/0237-2, UPIN 19103MF15701, Precinct 3, MWBE Contracted Goal: 30.79%, MWBE Current Participation: 67.10%.

end

 

Background and Discussion:

This project is located at Huffmeister Road and Fallbrook Drive, Houston, TX 77065. The project drains into HCFCD Unit No. E133-00-00. The scope and proposed improvements include providing stormwater detention storage to reduce flooding for subdivisions which drain to E133-00-00 and E133-01-00. It will also serve to mitigate two future drainage improvement projects: (1) within the Barwood Subdivision that ultimately outfalls into E133-00-00 and (2) the future Fallbrook Drive extension to Huffmeister Road to the existing Fallbrook Drive is located at the eastern ROW of HCFCD Unit E133-00-00.

The change in contract includes the following:

 

The line items are adjusted to reconcile overrun and underrun quantities on the project for completion of the proposed scope of work.

•         The increase of quantities on overrun line-item numbers 17, 23, 24, 27 and 55 for an addition in the amount of $20,603.10.

•         The decrease of quantities on underrun line-item numbers 4, 7, 8, 9, 10, 11, 12, 13, 14, 15, 18, 19, 25, 30, 32, 33, 34, 42, 51, 52, 54, 57, 58, 60, 61, 62 for a deduction in the amount of $129,797.42

•         Addition includes 88 days due to Abnormally heavy and persistent rainfall and due to delay caused by the third-party utility owner (Kinder Morgan)

The above additions and deductions result in a net change in the amount of -$109,194.32 and 88 days addition.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Wortham Estates subdivision.

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/15/2024

323 (24-4265)

Transmittal - Advertisement

12/10/2024

565 (24-7964)

Contract Award - Sprint Sand & Clay, LLC

04/30/2026

86 (26-2641)

Transmittal - Substantial Completion

 

Location: Wortham Estates Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

-$109,194.32

-$109,194.32

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$109,194.32

-$109,194.32

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$109,194.32

-$109,194.32

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/6/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 