File #: 25-2667    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of a change in contract with Merchants Bonding Company Mutual, in connection with final construction of Gessner Road, adding 22 calendar days, with a deduction in the amount of $71,140.82, Job No. 20/0362-1, UPIN 18104MF0R801, Precinct 1, Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 20/0362, UPIN 18104MF0R801

Vendor/Entity Legal Name (if applicable): Merchants Bonding Company Mutual

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Merchants Bonding Company Mutual, in connection with final construction of Gessner Road, adding 22 calendar days, with a deduction in the amount of $71,140.82, Job No. 20/0362-1, UPIN 18104MF0R801, Precinct 1, Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County’s M/WBE Program.

end

 

Background and Discussion:

This project is a transportation improvement project for Gessner Road between West Road and Beltway 8, which includes the construction of a new roadway, underground storm sewer systems, drainage culverts along intersecting side streets, large drainage culvert crossing of HCFCD Unit N. E141-00-00, and two detention ponds located on the north side of Houston in Precinct 1.

 

Changes include the addition of lines items to replace existing concrete, the addition of a pay item for a seal slab, the relocation of an existing fence, additional asphalt and additional cement treated sand for subgrade stabilization.  Also, the reconciliation of all bid items for final payment.

 

Expected Impact:

Changes will allow for the project to be constructed per the original intent.

 

Alternative Options:

Leave out additional scope and complete work using other county resources.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/26/2021

20.d.11.b

Contract Award

 

Location:

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

-$71,140.82

-$71,140.82

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$71,140.82

-$71,140.82

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$71,140.82

-$71,140.82

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 