Legislation Details

File #: 25-1197    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/14/2025 In control: Commissioners Court
On agenda: 2/27/2025 Final action: 2/27/2025
Title: Request for approval of an award on the basis of successful negotiations with the highest overall evaluation and that the County Judge execute an agreement with Quiddity Engineering, LLC in the amount of $4,085,689 for professional engineering, support services, and construction phase services for flood reduction improvements along Salt Water Ditch for the Flood Control District (230455), MWBE Contracted Goal: 20%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 230455

Vendor/Entity Legal Name (if applicable): Quiddity Engineering, LLC

MWBE Contracted Goal (if applicable): 20%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of successful negotiations with the highest overall evaluation and that the County Judge execute an agreement with Quiddity Engineering, LLC in the amount of $4,085,689 for professional engineering, support services, and construction phase services for flood reduction improvements along Salt Water Ditch for the Flood Control District (230455), MWBE Contracted Goal: 20%.

end

 

Background and Discussion:

Saltwater Ditch is a tributary to Sims Bayou that provides drainage to approximately 3.87 square miles of highly urbanized watershed which has led to increased flooding in the area. The Feasibility Study dated January 29, 2021, recommended (1) conversion of the existing Saltwater Ditch into an enclosed storm sewer system, from Calhoun Road to Sims Bayou (approximately 18,200 LF or 3.45 miles), and (2) design and construction of detention basins on sites owned by the City of Houston for flood mitigation. Project is located in south‐central Harris County within the corporate limits of the City of Houston south of I- 610 and east of SH-288. Design is bond and CDB-MIT funded, and Construction is CDBG-MIT funded.

 

Expected Impact:

The project will reduce flood risks and strengthen resiliency in the Sims Bayou Watershed by alleviating property and structural damages to adjacent communities. The project will provide flood risk reduction for approximately 1,221 residences in a 100-yr storm event. Project will also reduce the financial impact of recovery costs to Harris County and federal flood insurance program.

 

Alternative Options:

The alternative should the design not be approved is the Flood Control District will not be able to proceed with design and construction of the project and flood risk will remain the same.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

258

Advertisement of project approved

6/13/2024

13

Authorization to negotiate approved

 

Location: HCFCD Unit C118-00-00

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$2,000,000

$2,000,000

$2,000,000

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$2,000,000

$2,000,000

$2,000,000

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

 Total Funding Sources

$

$2,000,000

$2,000,000

$2,000,000

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/27/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Hany Malak, P.E., Department Manager, Capital Projects South, Jared Abbey, Sourcing Manager, Harris County Purchasing

Attachments (if applicable): Letter