Primary Department: County Engineer
Primary Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones, Commissioner Precinct 4
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24104MF37R01
Vendor/Entity Legal Name (if applicable): Diaz Engineering, LLC
MWBE Contracted Goal (if applicable): 21.7%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Diaz Engineering, LLC. in the amount of $563,902.60 for Professional Engineering Services in connection with Pedestrian Bridge and Hike and Bike Trail - Memorial MUD - 2023, UPIN 24104MF37R01, Precinct 4, MWBE Contracted Goal: 21.7%.
end
Background and Discussion:
This goal of this project is to design and construct approximately 4800 LF of recreational trail along the HCFCD channel T103-00-00 as well as a new pedestrian bridge over a HCFCD channel T103-000-01 within the Memorial MUD boundaries in Katy, Texas.
This agreement will provide professional services from the Engineer of Record for the completion of study and design phases.
Expected Impact:
This project would provide a Hike and Bike Path along the HCFCD Chanel which will connect several existing trails enhancing the mobility options for the non-motorized modes, safer and more efficient connectivity in addition to providing additional recreational opportunities for the surrounding communities; followed by developing improvement to address the safety, and mobility to each location to provide safer travel for pedestrians.
Alternative Options:
If no action is taken, the safety and mobility benefits associated with the proposed improvements will not be achieved, thereby depriving residents and pedestrians of the enhancements these improvements are intended to provide
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: I: Increase access to safe, clean, and enjoyable green space.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
2/06/2025 |
64 |
Authorization to Negotiate for Engineering Services |
Location: Katy Harris County TX
Address (if applicable):
Precinct(s): Precinct 4
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1070 - Mobility Fund |
$ |
$563,902.60 |
$563,902.60 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$563,902.60 |
$563,902.60 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$563,902.60 |
$563,902.60 |
$ |
Grants - Proposed Budget (For Grants Items only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 7/10/2025
Anticipated Implementation Date (if different from Court date): 8/7/2025
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer
Attachments (if applicable): Professional Services Agreement