Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0052, UPIN 23103MF2P001
Vendor/Entity Legal Name (if applicable): MB Western Industrial Contracting, Co.
MWBE Contracted Goal (if applicable): 19%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with MB Western Industrial Contracting Co, in connection with Bridge Repair - Brinsap 2020 Package 2 - 2022, with an addition in the amount of $56,784.44, Job No. 24/0052-2, UPIN 23103MF2P001, Precinct 3, MWBE Contracted Goal: 19%, MWBE Current Participation: 100%.
end
Background and Discussion:
The Bridge Repair - Brinsap 2020 Package -2 project site consists of improvements and repair of bridges in various locations within Harris County. Major work activities include erosion repairs to seven bridges in Harris County - Precinct 3. Erosion repair work includes restoring eroded channel sections mainly below the bridge and a ditch, re-installing failed riprap, installing new riprap, replacing failed existing concrete slope paving, installing new concrete slope paving, backfilling undermined abutment caps, undermined bottom of box culverts and undermined concrete slope paving, replacing sections of corrugated metal pipes, and backfilling sinkholes.
The changes in contracts include:
• An additional quantity of 10 Linear feet of 36 Inches of Corrugated Metal Pipe (CMP) is needed to replace the corroded CMP with an additional cost of $6,000.00 and zero calendar days.
• An additional quantity of 58 linear feet of 42" inches of Corrugated Metal Pipe (CMP) is needed to replace the corroded CMP with an additional cost of $49,687.44 and zero calendar days to complete the proposed work.
• A new line item for Trench Safety System is needed to install 42"-inches of Corrugated Metal Pipe (CMP) with an additional cost of $1,097.00 and zero calendar days to complete the proposed work.
Expected Impact:
The change will allow the contractor to complete the proposed work according to the design plan and repair the eroded CMP.
Alternative Options:
There is no other alternative available except the requested change will allow the contractor to complete the proposed work according to the design plan and restore eroded CMP.
County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
06/25/2024 |
288 (24-3913) |
Contract Award |
03/27/2025 |
593 (25-2059) |
Contract Amendment #1 for additional days and extension of project term |
Location:
Address (if applicable):
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1070 - Mobility Fund |
$ |
$56,784.44 |
$56,784.44 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$56,784.44 |
$56,784.44 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
1070 - Mobility Fund |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$56,784.44 |
$56,784.44 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 6/12/2025
Anticipated Implementation Date (if different from Court date): 4/10/2025
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B