Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): E533-01-00-E01
Vendor/Entity Legal Name (if applicable): KCI Technologies, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: 0% - Specialized, Technical, or Unique in Nature
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of amendment No. 4 to an agreement with KCI Technologies, Inc, in the amount of $308,514, to provide engineering, bidding and construction phase services for Kolbe Road Subdivision Drainage Project (White Oak Bayou Watershed, Bond ID Z-02, Project ID E533-01-00-E001, Agreement No. 2026-69, Precinct 3, CDBG-MIT, Justification for 0% MWBE Participation Goal: 0% - Specialized, Technical, or Unique in Nature).
end
Background and Discussion:
This agreement will provide supplemental engineering, bidding, and construction phase services for the Kolbe Road Subdivision Drainage Project, which will reduce street flooding and improve subdivision drainage. The Flood Control District will construct the project on behalf of the Harris County Engineering Department using funding from the CDBG-MIT grant program.
This project includes drainage improvements consisting of updating existing roadside ditches with new grate inlets and circular pipes, along South Kolbe Road, South Kolbe Circle, Village Circle, Scott Circle, and Laura Circle within The Village at Cypress subdivision and bringing roads into compliance with county standards, and out falling to HCFCD Unit E133-01-00. The scope also includes improvements to the existing detention basin located along E133-01-00 at Huffmeister Road.
This project occurs in the third quartile under the 2022 Prioritization Framework approved by Commissioners Court.
Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the White Oak Bayou watershed by reducing street flooding and improving subdivision drainage.
Alternative Options:
The alternative to approving this item would be to secure a new Engineer of Record (EOR) which would significantly delay project implementation.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
01/23/2025 |
77. |
Approval of revised project lists for use in submitting applications for Community Development Block Grant Disaster Recovery (CBDG-DR) funds totaling up to $322 million and CDBG-Mitigation (CDBG-MIT) funds totaling up to $541.8 million |
|
08/06/2026 |
312. |
ILA with Office of County Engineer Agreement No. 2026-69 |
Location: Near Intersection of Telge Road and Cypress North Houston Road
Address (if applicable):
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
4.a.3 - Engineering Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Bonds |
$ |
$308,514 |
$308,514 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$308,514 |
$308,514 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$308,514 |
$308,514 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/19/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Agreement