File #: 26-0869    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/27/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of a change in contract with Hayden Paving, Inc, in connection with Asphalt Package 2024 - 3, adding 150 calendar days, with an addition in the amount of $924,116.00, Job No. 24/0383-1, UPIN 24208MF36J01, Precinct 3, MWBE Contracted Goal: 33.21%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No 24/0383, UPIN 24208MF36J01

Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.

 

MWBE Contracted Goal (if applicable): 33.21%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hayden Paving, Inc, in connection with Asphalt Package 2024 - 3, adding 150 calendar days, with an addition in the amount of $924,116.00, Job No. 24/0383-1, UPIN 24208MF36J01, Precinct 3, MWBE Contracted Goal: 33.21%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

The project is in Harris County, Precinct 3 in City of Houston.  The scope of work consists of but not limited for the rehabilitation for Asphalt roadways - Approximately 4.5 miles of roads as follows: Root Road (1.9 miles), Dowdell Road (0.35 miles) and Kuykendahl Road (2.2 miles) and full depth reconstruction of Holy Road (1.23 miles)

 

The Changes in contract include:

•                     Adding Holy Road to the project as an additional scope of work resulted in adjustments to multiple line items; both increases and decreases across various line items, yielding a net added cost of $924,116.00 and extending the contract duration by 150 calendar days

 

Expected Impact:

Roadway rehabilitation will provide a new road section designed for major thoroughfare traffic and include intersection improvement.  Improving the roadways will ensure reliable and safe transportation routes to businesses and residents of Harris County. Work will also include signing & pavement striping, and site restoration.

 

Alternative Options:

Leaving roadways in its current condition will continue to deteriorate if repairs and rehabilitation are not performed in the near future.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/23/2025

156 (25-0442)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$924,116.00

$924,116.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$924,116.00

$924,116.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Other 3109

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$924,116.00

$924,116.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B