Legislation Details

File #: 25-1855    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/14/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval of an amendment to an agreement with KUO & ASSOCIATES INC in the amount of $57,511.00 for Professional Engineering Services to provide improvements to Northpointe Boulevard Segment 1 - from Grant Road to Shaw Road - 2019, UPIN 20104MF1BP01, Precinct 3, MWBE Contracted Goal:19.6%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 20104MF1BP01

Vendor/Entity Legal Name (if applicable): KUO & ASSOCIATES INC

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with KUO & ASSOCIATES INC in the amount of $57,511.00 for Professional Engineering Services to provide improvements to Northpointe Boulevard Segment 1 - from Grant Road to Shaw Road - 2019, UPIN 20104MF1BP01, Precinct 3, MWBE Contracted Goal:19.6%.

end

 

Background and Discussion:

This project is located at Northpointe Boulevard in Precinct 3. This project will be extending Northpointe Boulevard from Grant Road to Shaw Road. The project includes dual 930’ bridges that spans the floodway and two 16 acre detention basins.

 

Expected Impact:

This amendment will be proposing the extension of Northpointe Boulevard by providing a 4-lane concrete boulevard with 32 foot raised median within a 100’ ROW and a dual bridges over the Faulkey Gully channel floodway.

 

Alternative Options:

An alternative would be not to construct the extension of Northpointe Boulevard.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/19/2020

16b

Original Agreement

10/18/2022

32

Amendment #1

4/23/2024

59

Amendment #2

 

Location:

Address (if applicable): Northpointe Boulevard

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1000 - General Fund

$

$57,511.00

$57,511.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$57,511.00

$57,511.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$57,511.00

$57,511.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure, HCED.

 

Attachments (if applicable): Professional Services Agreement