File #: 24-3217    Version: 1 Name:
Type: Report Status: Passed
File created: 5/22/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of Study Report prepared by Weisser Engineering Company for Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, 20104MF1C401, Precinct 3.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 20104MF1C401

Vendor/Entity Legal Name (if applicable): N/A

 

MWDBE Contracted Goal (if applicable): Not Applicable

MWDBE Current Participation (if applicable): Not Applicable

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of Study Report prepared by Weisser Engineering Company for Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, 20104MF1C401, Precinct 3.

end

 

Background and Discussion:

The project proposes a redesign of a critical 4-lane boulevard within a 100-foot right-of-way, transitioning from a 14-foot to a 32-foot median, and shifting from traditional roadside ditches to shallow swales for improved stormwater management. The design includes strategic median openings and left turn lanes at key intersections like Rolling Falls Drive and Tall Pine Vista Lane, enhancing traffic flow without the need for additional signals. A new 5-foot-wide sidewalk along the north right-of-way will enhance pedestrian safety, complemented by an underground storm sewer system leading to a detention basin designed to meet Atlas 14 requirements. Adjustments at the M122-00-00 culvert crossing are also planned to improve safety and hydraulic performance, with necessary right-of-way and easement verifications to ensure compliance and facilitate effective implementation, reflecting a comprehensive approach to modern, sustainable urban roadway design.

 

Expected Impact:

To enhance traffic flow, pedestrian mobility, and stormwater management through redesigned medians, new sidewalks, and an upgraded drainage system, improving community connectivity and resilience while ensuring environmental sustainability and legal compliance.

 

Alternative Options:

If study report is not approved the project will not be completed.

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

          $

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

          $

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 4, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure, HCED

 

Attachments (if applicable): N/A