File #: 25-7939    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/1/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval of an amendment to the technical consultant contract with Freese & Nichols, Inc. to align with the Texas Water Development Board's contract amendment, updating deadlines for the Technical Memorandum, draft Flood Management Evaluation (FME), and Regional Flood Plan deliverable, with the amendment to be executed by the Office of the County Engineer.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not Applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 24208MF3BN01

Vendor/Entity Legal Name (if applicable): Freese & Nichols Inc.

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable):0%

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):Not Applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): Grantor does not allow indirect cost capture

 

Request Summary (Agenda Caption):

title

 

Request for approval of an amendment to the technical consultant contract with Freese & Nichols, Inc. to align with the Texas Water Development Board’s contract amendment, updating deadlines for the Technical Memorandum, draft Flood Management Evaluation (FME), and Regional Flood Plan deliverable, with the amendment to be executed by the Office of the County Engineer.

 

end

 

Background and Discussion:

 

The San Jacinto Regional Flood Planning Group (Region 6) was created by the 2019 Texas Legislature to develop a bottom-up, transparent flood plan for a densely populated, storm-prone area spanning parts of eleven counties from Galveston to Walker County. Its first plan, submitted in July 2023, analyzed basin conditions, identified flood “hot spots,” evaluated existing management practices, and set region-wide goals for resilience. The 2023 recommendations-405 technical evaluations, 65 non-structural strategies, and 70 structural projects-carry an estimated $33.8 billion price tag, with funding to be secured from local, state, and federal sources.

 

Expected Impact:

The recommended flood mitigation projects are projected to remove over 100,000 structures from the 1%-annual-chance floodplain (bringing the total down from about 159,600 to 97,500) and protect roughly 443,000 residents, while reducing low-water crossings from 101 to just 20. Critical facilities at risk would drop by more than half (from 4,957 to 2,194), and residential exposure would decline by about 83,000 homes. Complementary non-structural measures will improve floodplain mapping for roughly 63% of the region and close key data gaps (about 37%), alongside environmental restoration and public outreach actions that deliver added socioeconomic and ecological benefits.

 

 

 

 

 

Alternative Options:

 

If not approved, this project will not be able to proceed with the 2nd TWDB planning cycle, resulting in unused grant fund this location to continue operating under the current conditions for the community located in this area.

 

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/27/2023

116

Approval of Discussion Item

11/10/2020

1.z

Approval of Discussion Item

11/12/2024

201

Approval to accept from the Texas Water Development Board (TWDB) grant funds in the amount of $3,770,000,

 

Location:

Address (if applicable):

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

Professional Services - FNI- San Jacinto Regional Flood Planning Group 2024-2028. Funding Code: 2602 Dept: 20800901

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/11/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM Chief County Engineer, Harris County Engineering Department

 

Attachments (if applicable): FNI Contract Amendment and TWDB SJRFPG 2nd cycle Regional Flood plan Development (2024-2028)