Legislation Details

File #: 26-2872    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 4/29/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval to execute an interlocal agreement between Harris County and The Houston Parks Board LGC, Inc. to develop designs and construct three (3) connections to fill missing gaps in the greenway network at Sims Bayou for multimodal connections and all related appurtenances, UPIN 26101PRPNB01, Precinct 1.
Attachments: 1. 26-2872-ILA-26101PRPNB01-GreenwayConnectivity-HPBLGC-P1-5.14.2026 Agmt

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): UPIN 26101PRPNB01

Vendor/Entity Legal Name (if applicable): Houston Parks Board LGC, Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  Exempt - Interlocal/Cooperative Agreement

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an interlocal agreement between Harris County and The Houston Parks Board LGC, Inc. to develop designs and construct three (3) connections to fill missing gaps in the greenway network at Sims Bayou for multimodal connections and all related appurtenances, UPIN 26101PRPNB01, Precinct 1.

end

 

Background and Discussion:

Multimodal access is essential to support Harris County’s goals for Safety, Transportation, and Public Health. Current gaps in the greenway network limit safe and direct access to major community destinations. These include Houston Sports Park, SaberCats Stadium, HCC South Campus, and South Early College High School. Connectivity to the future Hill at Sims is also constrained from both the northeast and southwest. Addressing these gaps will strengthen mobility, access, and overall community well-being.

 

Expected Impact:

The proposed connections will close critical gaps in the greenway network and enhance safe mobility options. Improved access is anticipated to encourage more walking and biking. These changes support long-term public health and transportation goals.

 

Alternative Options:

The County could choose not to proceed, but this would leave existing connectivity gaps unaddressed and maintain reduced pedestrian and bicycle access.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: n/a

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 1. Sims Bayou at Airport Blvd/Scott St; 2. Sims Bayou from Alma Allen Bridge to Furman Road and East Orem Drive; 3. Sims Bayou at Cullen Blvd.

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Interlocal agreement

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109 - Road and Bridge Bonds

$

$7,750,000

$7,750,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$7,750,000

$7,750,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$7,750,000

$7,750,000

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Lauren Valdes, Assistant Director-Contracts & Procurement - Office of the County Engineer.

 

Attachments (if applicable): Interlocal Agreement