File #: 21-4768    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/6/2021 In control: Commissioners Court
On agenda: 9/14/2021 Final action: 9/14/2021
Title: Request for approval of change in contract with TEXASCHILE INC., Almeda Heights Subdivision Drainage Improvements - 2018, an addition of $15,460.21 adding 28 calendar days, Job No. 20/0342-2, Precinct 1.

Department: County Engineer

 

Department Head/Elected Official: John R. Blount, P.E., County Engineer

 

Regular or Supplemental RCA:

Regular RCA

Supplemental RCA

 

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN - 19101MF16101

Vendor/Entity Legal Name (if applicable): TEXASCHILE INC

MWDBE Participation (if applicable): N/A

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract with TEXASCHILE INC., Almeda Heights Subdivision Drainage Improvements - 2018, an addition of $15,460.21 adding 28 calendar days, Job No. 20/0342-2, Precinct 1.

end

 

Background and Discussion:

The Almeda Heights subdivision consists of 18 approximately half acre single-family residential lots. Four of the 18 lots are undeveloped. The subdivision utilizes roadside ditches to convey drainage. Fellows Road and Grammar Street drain toward Labrador and then north, outfalling into HCFCD Ditch C139-00-00 in the Clear Creek Watershed. Drainage analysis of the subdivision began in late 2019 as a part of the 2018 Bond program for subdivision drainage improvements. The scope and proposed improvements consist of re-grading the existing roadside ditches at 0.1% slope and reshaping the cross sections to meet Harris County Engineering Department requirements. Driveway culverts will be removed and replaced with larger sizes as outlined in this analysis

 

 

Expected Impact:

 

 This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to 18 lots in the community. This change in contract is a step in the construction process to reduce the financial, physical, and emotional burden flood damage places on homeowners.

 

 

 

Alternative Options:

Options on the extent of change were evaluated and confirmed in the field with Harris County inspectors and managers. No alternatives provided were without change in cost and scope adjustment.

 

 

Alignment with Goal(s):

Justice and Safety

Economic Opportunity

Housing

Public Health

Transportation

Flooding

Environment

Governance and Customer Service

 

Prior Court Action (if any):

02/26/2021 Agenda Item 267, Court approved the award to TexasChile low bid in the amount of $278,396 for drainage improvement in the Almeda Heights Subdivision in Precinct 1

7/20/2021 Agenda Item 105, Court change in contract with TexasChile, Inc., no change in contract amount, adding 28 calendar days

 

 

Location:

Address (if applicable list below):

 

 

Countywide

Precinct 1

Precinct 2

Precinct 3

Precinct 4

 

Fiscal and Personnel Summary

Service Name

-

FY 21-22

Estimates

 

 

 

FY 22

Next 3 FYs

Incremental Expenditures

Labor Expenditures

-

-

-

Non-Labor Expenditures

-

-

-

Total Incremental Expenditures

-

-

-

Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify)

Existing Budget

Fund 1080 - Special Mobility Funds-

$278,396-

-

-

 

-

-

-

-

 

-

-

-

-

Total Current Budget

-

-

-

Additional Budget Requested

Fund 1080 - Special Mobility Funds-

$15,460.21-

-

-

 

-

-

-

-

 

-

-

-

-

Total Additional Budget Requested

$15,460.21-

-

-

Total Funding Sources

$293,856.21-

-

-

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Implementation Date: 9/14/2021

 

Emergency/Disaster Recovery Note:

Not an emergency, disaster recovery, or COVID-19 related item

 

Emergency Item

COVID-19 related Item

Disaster Recovery related Item

 

Contact(s) name, title, department:

Marcus Baskin, RRD Manager, Recovery and Resiliency Dept.

 

Attachments (if applicable): Change in Contract