Legislation Details

File #: 25-0876    Version: 1 Name:
Type: Financial Authorization Status: Passed
File created: 1/24/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as North Eldridge Parkway - from Spring Cypress Road to Gregson Road - 2015, tract number 2, for $750,000.00 which is $53,040.00 over the appraised value, UPIN 15104MF0D701, Precinct 3.
Attachments: 1. 25-0876-FA-UPIN 15104MF0D701-NEPkwy from Spring Cypress to Gregson Rd Tr.2-P3-02062025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not Applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

 

Project ID (if applicable): 15104MF0D701

Vendor/Entity Legal Name (if applicable): Not Applicable

 

MWBE Contracted Goal (if applicable): Not Applicable

MWBE Current Participation (if applicable): Not Applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not Applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as North Eldridge Parkway - from Spring Cypress Road to Gregson Road - 2015, tract number 2, for $750,000.00 which is $53,040.00 over the appraised value, UPIN 15104MF0D701, Precinct 3.

end

 

Background and Discussion:

North Eldridge Parkway from north of Spring Cypress Road to south of Gregson Road a Standard 4-lane concrete boulevard in 100-foot ROW with 32-foot raised median and underground storm sewer system. The southern project limit at Spring Cypress Road requires extending the southbound left turn lane to the standard 250 feet. Include median openings and left turn lanes with 100 feet of storage at Lakewood Hills Drive, Randy Riley Way, and Treetop Hills Lane. North Eldridge Parkway at Gregson Road, A Traffic Signal Warrant Study (TSWS) was conducted in 2015 and a signal is warranted. Design a mast arm signal with related pedestrian appurtenances and include 150 feet of storage in both left turn lanes. Construct a 5-foot-wide sidewalk along the North Eldridge Parkway west ROW from Spring Cypress Road to the existing sidewalk approximately 280 feet south of Westlock Drive and along the North Eldridge Parkway east ROW from Spring Cypress Road to Lakewood Hills Drive and from Gregson Road to the existing sidewalk approximately 230 feet south of Westlock Drive. Detention basin is required for mitigation. The geometry of a basin will follow HCFCD design criteria and have 4:1 or flatter side slopes. Property acquisition is required to construction detention basin.

 

 

Expected Impact:

The project will address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.

 

 

Alternative Options:

If no action is taken, the project will experience delays in improving mobility in the area.

 

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/15/2024

92

Public Necessity Approval

 

Location:

Address (if applicable): 0 Spring Cypress, Tomball, TX  77377

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$750,000.00

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$750,000.00

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$750,000.00

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/6/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

 

Attachments (if applicable): Survey Map