Legislation Details

File #: 25-1804    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/13/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval of an award on the basis of successful negotiations with the highest overall evaluation and that the County Judge execute an agreement with IDS Engineering Group, Inc., in the amount of $1,414,103 for professional engineering and design for Barrett Station drainage improvements for the Flood Control District for the period of March 27, 2025 - March 31, 2027 (240074), MWBE Contracted Goal: 19.6%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240074

Vendor/Entity Legal Name (if applicable): IDS Engineering Group, Inc.

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of successful negotiations with the highest overall evaluation and that the County Judge execute an agreement with IDS Engineering Group, Inc., in the amount of $1,414,103 for professional engineering and design for Barrett Station drainage improvements for the Flood Control District for the period of March 27, 2025 - March 31, 2027 (240074), MWBE Contracted Goal: 19.6%.

end

 

Background and Discussion:

The proposed project will enhance the stormwater conveyance by adding a large subsurface box culvert and improving earthen roadside ditches particularly along Mile Drive and Sandman Avenue.  Improvements to a proposed pumped stormwater detention basin is also scoped for the project. The feasibility study determined that local drainage issues were due to siltation, low capacity, and limited conveyance capacity across the SJRA canal.  Priortization score for this project is 2nd quartile and a score of 5.02.   The project is to receive funding from the 2023 CDBG-MIT Program. 

 

This contract is for the preparation of the construction package for the Barret Station neighborhood drainage improvements.  The contact also covers survey, geotechnical, environmental and SUE services that are supported by MWBE/subconsultants.  Additional services by the prime include bidding and construction phase services. 

 

Expected Impact:

The proposed project will reduce the ponding depth during the 100-year event in Dreamland Place subdivision by more than a foot, and in the Barrett Settlement and Saint Charles Place subdivisions by more than quarter of a foot. The project is anticipated to provide full benefit to around 100 structures in the 100-year flood plain. 

 

Alternative Options: Selection of alternative vendor from RFQ.  Renegotiations will impact critical path, which could impact meeting grant milestone deadlines and program deadlines.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/6/2024

24-3557

Request for approval on the basis of highest overall evaluation and authorize negotiations with IDS Engineering Group for professional engineering and design for Barrett Station drainage improvements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240074), MWDBE Contracted Goal: 19.6%.

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$500,000

$500,000

$200,000

Grant

$

$

$

$200,000

Choose an item.

$

$

$

$

Total Existing Budget

$

$500,000

$500,000

$400,000

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$500,000

$500,000

$400,000

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Tommi Jo Scott, Sr. Project Manager, Flood Control District, Jared Abbey, Sourcing Manager, Harris County Purchasing

Attachments (if applicable): Letter