File #: 25-4638    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 7/22/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval to execute an agreement with Associated Testing Laboratories, Inc. in the amount of $432,734.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Houmont Park Subdivision Drainage Improvements - 2018, UPIN 19101MF14G01, Precinct 1, MWBE Contracted Goal: 100%.
Attachments: 1. 25-4638-Award- 19101MF14G01-Associated Testing Houmont Park

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 19101MF14G01; Job No. 25/0194

Vendor/Entity Legal Name (if applicable): Associated Testing Laboratories, Inc.

 

MWBE Contracted Goal (if applicable): 100% - MWBE/HUB/DBE

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Associated Testing Laboratories, Inc. in the amount of $432,734.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Houmont Park Subdivision Drainage Improvements - 2018, UPIN 19101MF14G01, Precinct 1, MWBE Contracted Goal: 100%.

end

 

Background and Discussion:

 

This project is located in northeast Harris County in the Greens Bayou (P100-00-00) watershed, east of John Ralston Road and north of Beaumont Highway. The existing drainage system is comprised of three earthen, trapezoidal open channels (P110-00-00, P110-04-00 and P117-00-00) owned and maintained by Harris County Flood Control District (HCFCD). The proposed improvements include re-grading the existing roadside ditches 1,000-feet east and west of the existing drainage channels, replacing inadequate driveway and roadway culverts and channel improvements of the HCFCD Unit Numbers P117-00-00, P110-04-00, and P110-00-00. Other improvements include a detention basin to cause no adverse impacts downstream and Green River Dr close system drainage.

 

 

 

 

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2025

377 (25-0410)

Approved Authorization to Negotiate

 

Location: Houmont Park Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3021

$

$432,734.00

$432,734.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$432,734.00

$432,734.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$432,734.00

$432,734.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable):