Legislation Details

File #: 26-0127    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/19/2025 In control: Commissioners Court
On agenda: 1/8/2026 Final action: 1/8/2026
Title: Request for approval of change in contract No. 6 with Lecon, Inc., for general repairs in North Harris County (Project ID Z100-00-00-X300, Job No. 24/0122, Countywide, MWBE Contracted Goal: 22.24%, MWBE Current Participation: 7.66%).

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Z100-00-00-X300

Vendor/Entity Legal Name (if applicable): Lecon, Inc.

 

MWBE Contracted Goal (if applicable): 22.24%

MWBE Current Participation (if applicable): 7.66%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract No. 6 with Lecon, Inc., for general repairs in North Harris County (Project ID Z100-00-00-X300, Job No. 24/0122, Countywide, MWBE Contracted Goal: 22.24%, MWBE Current Participation: 7.66%).

end

 

Background and Discussion:

This change in contract is needed to complete the construction contract for this project. General Drainage

System Repairs (North) includes erosion and slope failure repair, sediment removal and disposal, installation of granular fill and riprap, and the removal and replacement of various drainage structures such as pipes, headwalls, wingwalls, concrete channel linings, low-flow sections, and outfall structures. The purpose of this contract change is to add project scope to complete the construction of the project site P130-09-00-X009. The

contract change includes the addition of new bid item for the installation of a drainage structure.

 

Expected Impact:

This change will allow the contractor to construct the project so that Harris County can realize intended flood

risk reduction benefits.

 

Alternative Options:

This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/07/2024

257.

Advertisement

06/25/2024

286.

Award

05/22/2025

154.

Renewal

 

Location: N/A

Address (if applicable):

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/8/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Change in Contract