Legislation Details

File #: 26-4182    Version: 1 Name:
Type: Public Necessity Status: Passed
File created: 6/23/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) road easement & two (2) temporary construction easement tracts for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.
Attachments: 1. (PN)20104MF1BH01-BirnamWoodSeg2-P3-7-9-26.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): 20104MF1BH01

Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

 

MWBE Contracted Goal (if applicable): Not applicable

MWBE Current Participation (if applicable): Not applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) road easement & two (2) temporary construction easement tracts for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.

end

 

Background and Discussion:

This project expands Birnam Wood Boulevard from south of HCFCD Unit No. J109-01-01 to Cypresswood Drive from an existing two-lane concrete half-boulevard to a full boulevard section. Improvements include adding two southbound lanes constructed of concrete, a 32 foot grass median, a new southbound bridge at the J109-01-01 channel, southbound left turn lanes at Fern Hill Drive and Battle Spring Drive, sidewalks on both sides of Birnam Wood Boulevard, and a new traffic signal at Fern Hill Drive. Improvements to existing sections of Birnam Wood Boulevard include left turn lanes at Cypresswood Drive, Goldspring Lane, North Spring Drive, Allyson Lane, Green Lodge Circle, and Fern Hill Drive, as well as pavement reconstruction at Goldspring Lane, Green Lodge Circle, Fern Hill Drive, and Battle Creek Drive. The total project length is approximately 2,600 feet and will connect to a future project south of the J109-01-01 channel that extends Birnam Wood Boulevard to 450 feet north of Hickorygate Drive. 

 

Drainage for the project will be subsurface. The proposed system includes curb inlets along the southbound lanes and trunkline within the median. The proposed system will connect to an existing storm sewer system between the existing and proposed bridges. Drainage for combined system will outfall at the J109-01-01 channel. 

 

Expected Impact:

If approved, Temporary Construction Easement/corner clips acquisition will be complete and construction of proposes Roadway and drainage improvements will be completed.

 

Alternative Options:

No Alternative options.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Various location (see attachments)

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/9/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Dr. F. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer

 

Attachments (if applicable): Findings and Declarations; Metes and Bounds