Title: Transmittal by the Flood Control District of a certificate of substantial completion with Texas Dewatering LLC, for the Addicks Reservoir, Barker Reservoir Watersheds Package 2 (Project ID Z100-00-00-X335, Job No. 25/0365, Precincts 3 and 4).
Attachments: 1. 26-6721-101526 TRANSMITTAL SUB COMP Z100-X335 PCTS 3, 4 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): Z100-00-00-X335

Vendor/Entity Legal Name (if applicable): Texas Dewatering LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a certificate of substantial completion with Texas Dewatering LLC, for the Addicks Reservoir, Barker Reservoir Watersheds Package 2 (Project ID Z100-00-00-X335, Job No. 25/0365, Precincts 3 and 4).

end

 

Background and Discussion:

The purpose of this transmittal is to notify the Commissioners Court of the substantial completion of construction activities for Project Z100-00-00-X335, HCFCD Disaster Recovery Program (DRP) FEMA Sediment Removal Program (SRP), Addicks & Barker Package 2. The project included removal of sediment deposited by Hurricane Harvey within four tributary channels totaling approximately 3,750 linear feet in the Addicks and Barker Reservoir watersheds. Construction began on April 20, 2026, and reached substantial completion on July 10, 2026. Construction began on April 20, 2026, and reached substantial completion on July 10, 2026. This item is being brought forward to allow contract closeout activities to proceed, including the release of retainage and processing of final payment.

 

Expected Impact:

Substantial Completion signifies that the project is largely complete, allowing the Flood Control District to realize the intended flood risk reduction benefits while the Contractor completes any remaining minor items. The project has restored the affected channels to their pre-storm form and hydraulic capacity, returning them to the condition that existed prior to August 2017.

Alternative Options:

There is no viable alternative to accepting substantial completion when a Contractor successfully completes the work scope of a contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/29/2026

212.

Award

 

Location: Addicks Watershed: U101-00-00-X032, U106-07-00-X019, U130-00-00-X005; Barker Watershed: T101-07-00-X028

Address (if applicable):

Precinct(s): Precincts 3 & 4

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 