Legislation Details

File #: 25-0274    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/26/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval of an award on the basis of low bid to Bayou Builders in the amount of $814,700 for desilt concrete lined channels and related items for the Flood Control District for the period of February 1, 2025 - January 31, 2026, with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (240360), MWBE Contracted Goal: 22.77%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240360

Vendor/Entity Legal Name (if applicable): Bayou Builders

 

MWBE Contracted Goal (if applicable): 22.77%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Bayou Builders in the amount of $814,700 for desilt concrete lined channels and related items for the Flood Control District for the period of February 1, 2025 - January 31, 2026, with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (240360), MWBE Contracted Goal: 22.77%.

end

 

Background and Discussion:

This Term Contract is for Infrastructure Repairs consists of project work orders to include desilting concrete lined channels for projects located within Harris County, Texas.  Major emphasis of the project work order repairs will be earthwork, including but not limited to removal and disposal of sediment accumulations on concrete channels, light erosion repair, granular 3” X 5” fill and riprap installation, pipe removal and replacement, outfall structure removal and replacement, and related items.

 

Expected Impact:

 The intent of this work order repair Contract is for Infrastructure Repair to establish a means for conducting priority sediment repair work orders countywide for Harris County, Texas. 

 

Alternative Options:

No award will increase the response time to the work repair projects to reduce flooding within the watersheds throughout the county. 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

414

Transmittal by Purchasing of a project scheduled for advertising

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other

$

$814,700.00

$814,700.00

$814,700.00

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$814,700.00

$814,700.00

$814,700.00

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$814,700.00

$814,700.00

$814,700.00

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): 2/7/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Helen Stallkamp, P.E., Project Manager, Maintenance Engineering Dept.; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter, Bid Tab