File #: 24-3758    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 6/13/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval to negotiate an agreement with All-Terra Engineering, Inc. to provide materials engineering and testing services in support of the West Baytown Phase 1 Storm Sewer project on HCFCD Unit G100-00-00. (San Jacinto River Watershed, Bond ID Z-02, Project ID G100-00-00-G001, Precinct 2).
Attachments: 1. 062524 ATN ALL TERRA 2024-39 PCT 2 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): G100-00-00-G001

Vendor/Entity Legal Name (if applicable): All-Terra Engineering, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate an agreement with All-Terra Engineering, Inc. to provide materials engineering and testing services in support of the West Baytown Phase 1 Storm Sewer project on HCFCD Unit G100-00-00. (San Jacinto River Watershed, Bond ID Z-02, Project ID G100-00-00-G001, Precinct 2).

end

 

Background and Discussion:

This partnership project is in support of the West Baytown storm sewer improvement project, and it is the first of several project phases to address significant flooding that has recurred over the decades in the West Baytown area.  This project will replace a storm sewer trunkline which drains a 110-acre drainage area and provides the primary outfall for the West Baytown neighborhood. Along with the drainage improvements, the associated streets, water and sewer lines, and sidewalks will be reconstructed to meet current standards and requirements.

 

Expected Impact:

Materials engineering and testing services are required to ensure that the project is constructed in accordance with the HCFCD Construction Documents. Materials engineering and testing services under this agreement will provide essential quality control and assurance, ensuring that construction materials meet specified standards and performance criteria. This quality control and assurance will help ensure that flood risk reduction projects are constructed properly.

 

Alternative Options:

The alternative to approving this item would be to select another firm for this assignment, which would result in a delay in starting this project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: East Baytown - Oklahoma Street

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map