File #: 25-5410    Version: 1 Name:
Type: Grant Status: Passed
File created: 8/18/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Request by the Office of the County Engineer for approval to accept from Houston-Galveston Area Council grant funds in the amount of $200,000, with a local match of $50,000 provided by Precinct 2, for the South Belt Livable Center Study and that the County Judge execute an interlocal agreement with Houston-Galveston Area Council to conduct the South Belt Livable Center Study.
Attachments: 1. FINAL OCE Backup AWARD Agreement South Belt Livable Centers Study.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner Precinct 2

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Award

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Houston-Galveston Area Council

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  Exempt - Interlocal/Cooperative Agreement

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): Grantor does not allow indirect cost capture

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval to accept from Houston-Galveston Area Council grant funds in the amount of $200,000, with a local match of $50,000 provided by Precinct 2, for the South Belt Livable Center Study and that the County Judge execute an interlocal agreement with Houston-Galveston Area Council to conduct the South Belt Livable Center Study.

end

 

Background and Discussion:

The South Belt Livable Center Study was selected for federal grant funds in the amount of $200,000 with a local match of $50,000 through the Houston-Galveston Area Council’s (H-GAC) FY2025-28 Livable Centers Cycle 7 Call for Study Sponsors.  H-GAC’s Transportation Policy Council approved the study recommendation in the October 25, 2024 Transportation Council Policy meeting. The project is in the South Belt area of Harris County, Precinct 2, with boundaries extending from Fuqua Road and I-45, down to Dixie Farm Road, and along the Harris County Precinct boundary with the City of Pearland. Blackhawk Blvd runs through the project area and is the focus of the livable centers study, which H-GAC will conduct. South Belt is an area of unincorporated Harris County characterized by mixed-use places which require increased multimodal travel options.

 

Expected Impact:

This study aims to enhance mobility, safety, and accessibility in the South Belt community by identifying multimodal transportation improvements, including sidewalks, bike routes, transit access, and ADA-compliant facilities. These enhancements will reduce vehicle dependency, improve air quality, and strengthen connections to jobs, schools, and services, particularly for residents with limited mobility or without access to a car. The project will also promote resilient infrastructure through environmentally conscious design and flood mitigation strategies, supporting long-term cost savings. Fiscal impacts will be addressed through coordination with regional partners.

 

Alternative Options:

Without a planning study, future improvements would lack the coordinated effort necessary for cost efficiency and alignment with county and regional goals.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N3: Promote increased physical activity of residents.

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/15/24

186

Approval to submit South Belt Corridor (sic) Livable Centers Study

 

Location:

Address (if applicable): Approximately 42 square miles in the South Belt area, encompassing I-45, south along Dixie Farm Road and north up to Fuqua Road, extended along the precinct border with the City of Pearland. Blackhawk Blvd runs through the middle of the proposed livable center location.

 

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Precinct 2 Other

$

$50,000

$50,000

2

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$200,000

$200,000

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/26/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Sr. Director, Planning & Development Services, Office of the County Engineer

 

Attachments (if applicable): Court Order, Interlocal Agreement (includes budget, scope, and map)