File #: 25-6180    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval to execute an agreement with Neel-Schaffer, Inc., in the amount of $109,585.00 for professional engineering services in connection with Aldine Village Subdivision Drainage Improvements - 2018, UPIN 19102MF13501, Precinct 2, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 25-6180-Award-19102MF13501-Aldine Village-Oak Glen Place-Neel-Schaffer Inc.-P2

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 19102MF13501

Vendor/Entity Legal Name (if applicable): Neel-Schaffer, INC.

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Neel-Schaffer, Inc., in the amount of $109,585.00 for professional engineering services in connection with Aldine Village Subdivision Drainage Improvements - 2018, UPIN 19102MF13501, Precinct 2, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.

end

 

Background and Discussion:

The Aldine Village Subdivision is in north Harris County, between I-45 and Hardy Toll Road, in the Halls Bayou Watershed. The subdivision is served by roadside ditches and culverts. Factors, such as flat topography, have resulted in low capacity of the roadside ditches and sediment buildup within the ditches and culverts. The scope of work for this project is to install improved and up-sized drainage infrastructure for mitigation. The easement to be acquired is to allow the storm sewer culverts to connect to the outfall structure required for mitigation.

 

Expected Impact:

Construction phase services by the Engineer of Record support the construction team with technical advice and quality assurance. Expected positive impact to the long-term goal of reducing drainage cost in the future. No impact on project schedule or staffing anticipated.

 

 

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

8/27/24

50 (24-5075)

CPS Agreement Approved with LAN

 

Location:

Address (if applicable): Aldine Village Subdivision

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$109,585.00

$109,585.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$109,585.00

$109,585.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$109,585.00

$109,585.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Harris County Engineering Department

 

Attachments (if applicable): Agreement