File #: 25-3794    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/10/2025 In control: Commissioners Court
On agenda: 6/26/2025 Final action: 6/26/2025
Title: Request for approval of an amendment to an agreement with Atser, L.P. in the amount of $235,740.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Burnett Bayland Park - Phase 1A.1 Landscape - 2024, UPIN 25104MF3UE01 in addition to Burnett Bayland Park - Design Phase - 2024, UPIN 24104MF3HC01 Precinct 4, MWBE Contracted Goal: 100%.
Attachments: 1. 25-3794-CIC-25104MF3UE01-Burnett Bayland Park-Phase 1A.1-Atser, LP-P4-6.26.25

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 25104MF3UE01; Job No. 25/0083

Vendor/Entity Legal Name (if applicable): Atser, L.P.

 

MWBE Contracted Goal (if applicable): 100% 

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Atser, L.P. in the amount of $235,740.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Burnett Bayland Park - Phase 1A.1 Landscape - 2024, UPIN 25104MF3UE01 in addition to Burnett Bayland Park - Design Phase - 2024, UPIN 24104MF3HC01 Precinct 4, MWBE Contracted Goal: 100%. 

end

 

Background and Discussion:

 

Burnett Bayland Park is located in Harris County Precinct 4 on the west side of Houston inside Beltway 8 loop. The park is located at the intersection of Gulfton Street and Chimney Rock Road. The park is bounded by Gulfton Street on the north, Chimney Rock Road on the east, Alder Dr on the west, and extended park area on the south side. Burnett Bayland Park is a 40-acre park that features skate park, walking trails, community center, play areas, basketball courts etc. The proposed improvements include inclusive playground, detention basin, event lawn, multi-purpose courts, soccer fields, gaming and seating area, splash pad, rain gardens, restrooms, pavilions, covered basketball courts, multi-purpose courts, skate park etc. The additional funds will cover the construction phase services agreement to allow for construction oversight of the project for Phase 1A.1 - Site Development.

 

 

 

 

Expected Impact:

 

 This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  I3: Prioritize the development of new parks when developing and implementing a plan for how to leverage underused County-owned land, with a focus on equitable access.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2025

377 (25-0410)

Approved Authorization to Negotiate

05/08/2025

103 (25-2682)

Approved AOA

 

Location: Burnett Bayland Park - Phase 1A.1 Landscape 

Address (if applicable): N/A

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3239

$

$235,740.00

$235,740.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$235,740.00

$235,740.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$235,740.00

$235,740.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/26/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 