Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 23102MF2UM01
Vendor/Entity Legal Name (if applicable): HR Green, Inc.
MWBE Contracted Goal (if applicable): 7.44%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with HR Green, Inc. in the amount of $1,055,110.00 for professional engineering services in connection with Corridor Study - Wallisville Rd - Normandy St to Uvalde Rd - P2 - 2022, UPIN 23102MF2UM01, Precinct 2, MWBE Contracted Goal: 7.44%.
end
Background and Discussion:
The proposed professional services contract will provide design-phase services to support and advance the project. The project involves the reconstruction of Wallisville Road from Normandy St to Uvalde Rd. Improvements include expanding the roadway to four divided lanes with concrete pavement, curb and gutter and 6-foot sidewalks on both sides. Additional work includes storm sewer improvements, traffic signal construction, street lighting and bridge replacements. The total project length is approximately 6,000 feet and is located in eastern Harris County, Precinct 2. The initiative, aligned with Revive2Thrive vision, is designed to enhance safety and improve overall quality of life through evaluation and upgrades to existing infrastructure.
Expected Impact:
This project will deliver significant roadway improvements along with enhanced pedestrian and bicycle facilities. These improvements will promote safety for all users, improve mobility and connectivity throughout the project limits and make it more pedestrian and bicycle friendly environment and enhance neighborhood quality of life.
Alternative Options: If no action is taken, the provision of professional engineering services will be delayed.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
6/6/2023 |
23-3282 |
Request for approval to execute an agreement with HR Green, Inc. in the amount of $666,312.50 for Professional Engineering Services to provide a Corridor Study for Wallisville Road from 500 feet east of Normandy Street to Uvalde Road, UPIN 23102MF2UM01, Precinct 2, MWDBE Contracted Goal 51%. |
Location:
Address (if applicable): Wallisville Rd - from Normandy St to Uvalde Rd, Houston, TX 77013
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund |
$ |
$738,577.00 |
$738,577.00 |
$ |
|
Other |
$ |
$316,533.00 |
$316,533.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$1,055,110.00 |
$1,055,110.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$1,055,110.00 |
$1,055,110.00 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 2/26/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Contract and Exhibits