Legislation Details

File #: 26-4254    Version: 1 Name:
Type: Contract - Renewal Status: Passed
File created: 6/24/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of a renewal option with Environmental Allies, LLC; and Arrowstone Contracting, LLC for rehabilitation, restoration and related items to the Barker Reservoir Watershed for the Flood Control District for the period of October 1, 2026 - September 30, 2027, at a cost of $3,651,634, and for the County Clerk to execute any applicable bonds to be received (250213), MWBE Contracted Goal: 23.08%.
Attachments: 1. 26-4254 Renewal Job No. 250213 - Multiple Vendors

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Renewal

 

Project ID (if applicable): 250213

Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC ; Arrowstone Contracting, LLC

 

MWBE Contracted Goal (if applicable): 23.08%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a renewal option with Environmental Allies, LLC; and Arrowstone Contracting, LLC for rehabilitation, restoration and related items to the Barker Reservoir Watershed for the Flood Control District for the period of October 1, 2026 - September 30, 2027, at a cost of $3,651,634, and for the County Clerk to execute any applicable bonds to be received (250213), MWBE Contracted Goal: 23.08%.

end

 

Background and Discussion:

The Contract consist of project work orders that will be issued to the Contract for execution. Project work orders will include general earthen and concrete repairs, for projects located in the Barker Reservoir Watershed. Major emphasis of the project work order will be larger earthen slope failures and concrete channel lining repairs. This work will include but not be limited to full concrete panel replacement, concreted channel lining repairs, light erosion repair with granular fill 3“x5” fill and riprap installation, earthen slope failure, earthen toe failure, sinkholes, outfall pipe removal and replacement, inlet structure removal and replacement, concrete channel lining removal and related items. These services will provide support for infrastructure work that will be executed as a result of the passage of the “Maintenance Matters” Proposition in November 2024.

 

Expected Impact:

N/A

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/10/2025

235

Transmittal by Purchasing of a project scheduled for advertising

09/18/2025

257

Award

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

General Earthen and Concreate Channel Repairs (Countywide) for the Harris County Flood Control District

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$3,651,634

$3,651,634

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$3,651,634

$3,651,634

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$3,651,634

$3,651,634

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/9/2026

 

Anticipated Implementation Date (if different from Court date): 10/1/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Coy Custer, PE. Maintenance Engineering; Luke Herdrich, Senior Buyer,

Harris County Purchasing

 

Attachments (if applicable): Letter