Legislation Details

File #: 26-7664    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/6/2026 In control: Commissioners Court
On agenda: 11/19/2026 Final action:
Title: Request for approval of a change in contract with Cracon, Inc, in connection with final construction of Sidewalk and Access Management - Ella Blvd from Richey Rd to FM 1960, with an addition in the amount of $89,335.00, Job No. 22/0190-1, UPIN 21208MF21401, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.
Attachments: 1. 26-7664-CIC-21208MF21401-Ella Blvd-22-0190-1.Final-Cracon Inc-P1-11192026.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0190, UPIN 21208MF21401

Vendor/Entity Legal Name (if applicable): Cracon, Inc.

 

MWBE Contracted Goal (if applicable): 26%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Cracon, Inc, in connection with final construction of Sidewalk and Access Management - Ella Blvd from Richey Rd to FM 1960, with an addition in the amount of $89,335.00, Job No. 22/0190-1, UPIN 21208MF21401, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

This project is to improve Ella Boulevard from west Richey Road to FM 1960 approximately 1.5 mile consisting of the mill and overlay of existing asphalt pavement, access management measure installation, sidewalk on each side, metro bass station and three new signals.

 

This change order includes the final adjustment in the amount of $89,335.00.

 

Expected Impact:

The proposed improvement will provide safer conditions for both traffic and pedestrians. provide the safe route to school.

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/23/2022

246 (22-4709)

Contract Award

05/08/2025

129 (25-2643)

Contract Amendment #1 for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109

$

$89,335.00

$89,335.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$89,335.00

$89,335.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$89,335.00

$89,335.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/19/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B