Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): UPIN 20104MF1BQ01, Job No. 23/0411
Vendor/Entity Legal Name (if applicable): CenterPoint Energy
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Transmittal by the Office of the County Engineer to change the electric meter ESID number from 100 890 1025 0029 4770 0122 to 100 890 1025 0051 1213 0124 for Northpointe Blvd Segment 2 project.
end
Background and Discussion:
The Northpointe Blvd Segment 2 project is currently in construction. The project is widening the existing road from a 2-lane concrete road to a 4-lane concrete boulevard. with medians, curb and gutter drainage and a traffic signal at Northpointe Ridge Lane. The installation of the new traffic signal at Northpointe Ridge Lane is almost complete. A Service Outlet Location Statement (SOLS) with CenterPoint was previously approved with an initial ESID number. CenterPoint has since retired the initial ESID number and has issued a new ESID number for the electric service of the signal.
Expected Impact:
In issuing the new ESID number, CenterPoint Energy will be able to assign an account to the County for electric service to the traffic signal. The signal will be energized with a valid account for quantifying the consumption of electric charge.
Alternative Options:
No alternative option. Electric service is required for the traffic signal to function.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
X Governance and Customer Service
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
12/13/2022 |
22-7888 |
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with Center Point Energy and authorize the County Auditor to pay monthly utility bills for 18615 ½ Northpointe Ridge Lane, Tomball, TX 77377 (intersection of Northpointe Boulevard at Northpointe Ridge Lane) for electrical power serving a traffic signal, Precincts 3 and 4. |
Location: Northpointe Blvd at Northpointe Ridge Lane
Address (if applicable): 18615 ½ Northpointe Ridge Lane, Tomball, TX 77377
Precinct(s): Precinct 4
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering - Service Outlet Location Statement |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: December 19, 2024
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department
Attachments (if applicable): Service Outlet Location Statement Form