File #: 25-5130    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Request for approval of a change in contract with GLM Contracting, Inc., in connection with final construction for On-Call - Construction - General Civil, Precinct 3 - 2021, adding 62 calendar days, with a deduction in the amount of $32,453.96, Job No. 22/0019-1, UPIN 22103MF2E401, Precinct 3, MWBE Contracted Goal: 19%, MWBE Current Participation: 33.26%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0019, UPIN 22103MF2E401

Vendor/Entity Legal Name (if applicable): GLM Contracting, Inc.

 

MWBE Contracted Goal (if applicable): 19%

MWBE Current Participation (if applicable): 33.26%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with GLM Contracting, Inc., in connection with final construction for On-Call - Construction - General Civil, Precinct 3 - 2021, adding 62 calendar days, with a deduction in the amount of $32,453.96, Job No. 22/0019-1, UPIN 22103MF2E401, Precinct 3, MWBE Contracted Goal: 19%, MWBE Current Participation: 33.26%.

end

 

Background and Discussion:

Project includes general civil construction services for variety of locations throughout Precinct 3.  The terms of services in connection with the purchase order are being closed at the request of the Precinct, and in accordance with the recommendation of Harris County Office of the County Engineer.  The change will allow the unused funds to be returned to the Precinct.

 

PCO # 69 - Additional Days (62 days) - Contractor needed additional days from pending work of timber post which were installed by Precinct 3 for the dumpster.  The concrete ramp was completed after Precinct 3 installed timber post.  Precinct 3 project manager requested an additional scope of work that included a concrete foundation for chain link fence gate and re-grading behind building.

 

Expected Impact:

Change allows unused funds to be returned to the Precinct and allow the Contractor to be compensated for the actual work completed on the project.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/15/2024

220 (24-4236)

Contract Renewal

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3269

$

-$32,453.96

-$32,453.96

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$32,453.96

-$32,453.96

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$32,453.96

-$32,453.96

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/26/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B