Title: Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Prado Woods Subdivision Drainage Improvements - 2018, with a deduction in the amount of $36,474.95, Job No. 23/0462-3, UPIN 19103MF16N01, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 96.39%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0462, UPIN 19103MF16N01

Vendor/Entity Legal Name (if applicable): Sequeira Civil Construction, LLC

 

MWBE Contracted Goal (if applicable): 29%

MWBE Current Participation (if applicable): 96.39%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Prado Woods Subdivision Drainage Improvements - 2018, with a deduction in the amount of $36,474.95, Job No. 23/0462-3, UPIN 19103MF16N01, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 96.39%.

end

 

Background and Discussion:

The Prado Woods Subdivision Drainage Improvements project is in northwest Harris County, within the Cypress Creek Watershed. The subdivision is serviced by a single road, Prado Street, west of Grant Road. The existing storm water drainage system consists primarily of open ditches which ultimately outfalls to HCFCD Unit No. K100-00-00. This project includes the installation of underground drainage utilities, reconstruction of existing concrete pavement and driveways throughout the Prado Woods Subdivision.

 

The change in contract includes the following:

 

The line items are adjusted to reconcile overrun and underrun quantities on the project for completion of the proposed scope of work.

 

• The decrease of quantities on underrun line-item numbers 4, 6, 7, 13, 18, 20, 21, 34, 46, 49, 51, 55, 58, 59, 60 and 61 for a deduction in the amount of $36,474.95.

 

The above deductions result in a net deduction in the amount of -$36.474.95.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Prado Woods subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/27/2024

500 (24-1295)

Contract Award - Sequeira Civil Construction, LLC

01/09/2025

48 (25-0367)

Contract Amendment (23/0462-1) for additional funds and extension of project term

09/18/2025

42 (25-5641)

Contract Amendment (23/0462-2) for additional funds and extension of project term

 

Location: Prado Woods subdivision

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

-$36,474.95

-$36,474.95

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$36,474.95

-$36,474.95

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$36,474.95

-$36,474.95

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/30/2025

Anticipated Implementation Date (if different from Court date): N/A                     

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 