Legislation Details

File #: 26-5003    Version: 1 Name:
Type: Report Status: Passed
File created: 7/21/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval of a Study Report prepared by Weisser Engineering Company Inc for Boudreaux Road Segment 4 - from 200' east of Hufsmith-Kohrville Road to 700' south of SH-99, UPIN 23103MF2P601, Precinct 3.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Commissioner Tom S. Ramsey, P.E.

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 23103MF2P601

Vendor/Entity Legal Name (if applicable):Weisser Engineering Company Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a Study Report prepared by Weisser Engineering Company Inc for Boudreaux Road Segment 4 - from 200' east of Hufsmith-Kohrville Road to 700' south of SH-99, UPIN 23103MF2P601, Precinct 3.

end

 

Background and Discussion:

This project consists of upgrading Boudreaux Road Segment 4 to a standard 4-lane concrete boulevard in 100-foot ROW with 32-foot raised median and underground storm sewer system. Transition from existing 20-foot raised median to a 32-foot-wide median south of SH-99 along Gleannloch Forest Drive. Project includes 5ft Sidewalks along the south & east ROW, widen the existing BNSF Railroad at-grade crossing to accommodate a standard 4-lane concrete boulevard with a raised 32' median and a 5' sidewalk on the south Right of Way and drainage improvements.

 

Expected Impact:

 

 The project will improve the vehicular mobility for the local community, and the Safer for pedestrians.

 

 

 

 

Alternative Options:

Without this project, this road segment will continue operating under the current conditions without the improved 4 lane configuration.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/6/2026

Anticipated Implementation Date (if different from Court date): 8/25/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Study Report