Legislation Details

File #: 24-5067    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2024 In control: Commissioners Court
On agenda: 8/27/2024 Final action: 8/27/2024
Title: Request for approval of a change in contract with DT Construction, LP, in connection with Harris County Pollution Control Services Renovation-2020, located at 101 S. Richey St., Suite H., Pasadena, TX 77506, adding 273 calendar days, with an addition in the amount of $52,783.04, Job No. 22/0283, UPIN 21272MF22601, Countywide, MWDBE Contracted Goal: 15.2%, MWDBE Current Participation: 15.2%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 22/0283

Vendor/Entity Legal Name (if applicable): DT Construction

 

MWDBE Contracted Goal (if applicable): 15.2%

MWDBE Current Participation (if applicable): 15.2%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with DT Construction, LP, in connection with Harris County Pollution Control Services Renovation-2020, located at 101 S. Richey St., Suite H., Pasadena, TX 77506, adding 273 calendar days, with an addition in the amount of $52,783.04, Job No. 22/0283, UPIN 21272MF22601, Countywide, MWDBE Contracted Goal: 15.2%, MWDBE Current Participation: 15.2%.

end

 

Background and Discussion:

This project was approved on Commissioners Court on 10/13/2020.  Improvements include interior renovation of the office suite, adding emergency shower drains, and upgrading the laboratory suite to 100% operational during a disaster event, which includes a water tank for domestic water and a new 1000 kW emergency generator for electricity.

 

This change in contract provides additional general conditions as well as necessary materials, equipment and labor for additional safety requirements inside the suite, additional requirements by the City of Pasadena, and additional cost associated with electrical shut-down for the new generator.  This comes to a total of $52,783.04 and additional 273 calendar days.

 

Expected Impact:

Upon completion of the project, Harris County Pollution Control Services will be able to maintain full operations during major disaster and storm events.  The requested changes allow the completion of the project in accordance with the original intent of the project.

 

Alternative Options:

Commissioner court could postpone the change order, which would postpone the completion of the project, effecting substantial completion date.

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

X Public Health

_ Transportation

_ Flooding

X Environment

X Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/11/2022

p.33  257

Request for approval of an award on the basis of lowest priced proposal meeting requirements with DT Construction, LP in the amount of $3,359,000 for the construction price for office space renovations at the pollution control services building for Facilities & Property Maintenance with certain bids not being awarded, and for the County Clerk to execute any applicable bonds to be received for the construction price (220283), MWDBE Contracted Goal: 15.2%.

5/7/2024

p.8  52

Request for approval of a change in contract with DT Construction LP, in connection with Harris County Pollution Control Renovation - 2020, located at 101 S. Richey St., Suite H, Pasadena, TX 77506, adding 74 calendar days, with an addition in the amount of $119,871.64, Job No. 22/0283-1, UPIN 21272MF22601, Countywide, MWDBE Contracted Goal: 15.2%, MWDBE Current Participation: 15.2%.

 

Location:

Address (if applicable): 101 S. Richey, Suite H, Pasadena, TX 77506

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3259

$

$52,783.04

$52,783.04

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$52,783.04

$52,783.04

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$52,783.04

$52,783.04

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 27, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Ross Hosket, P.E., CFM, ENV- SP, (Interim) Director of Capital Project Facilities, Engineering Department

 

Attachments (if applicable): County Auditor’s Form 1258B (Job No. 22/0283-2)