Legislation Details

File #: 24-0657    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 1/23/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request for approval to execute an interlocal agreement with the City of Houston for Houston Parks and Recreation Department (HPARD) to take the asset and be the owner of the pedestrian and bike bridge with the connecting trails designed and constructed by Harris County, over White Oak Bayou (HCFCD Unit E100-00-00) from Oakbrook Greenspace to De Soto Street, Precinct 1.
Attachments: 1. 24-0657-Partnership-19101MF0XW01-City of Houston-White Oak Bayou Bridge -23GEN2558 01 30 2024

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): UPIN 19101MF0XW01

Vendor/Entity Legal Name (if applicable): City of Houston

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to execute an interlocal agreement with the City of Houston for Houston Parks and Recreation Department (HPARD) to take the asset and be the owner of the pedestrian and bike bridge with the connecting trails designed and constructed by Harris County, over White Oak Bayou (HCFCD Unit E100-00-00) from Oakbrook Greenspace to De Soto Street, Precinct 1.

end

 

Background and Discussion:

The project was initiated in 2019 to design and construct a pedestrian and bike bridge to provide the connection between Oakbrook Greenspace and De Soto Street at White Oak Bayou. Harris County will design and construct the bridge. City of Houston will take ownership of asset and maintenance after warranty period.

 

Expected Impact:

The proposed improvement will provide enhanced mobility for pedestrian access along White Oak Bayou Trail.

 

Alternative Options:

N/A

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X_Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/27/18

1.e.8

Authorization to Negotiate

10/13/2020

1.g.2

Consultant Agreement

 

Location:

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: January 30th, 2024

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department:  Dr. Hatem Elbastawisy, PE, (Interim) Senior Director of Project Delivery, Harris County Engineering Department

Attachments (if applicable): Interlocal Agreement