Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, PhD, P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 24090MF2ZQ01
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an Order authorizing and directing Harris County to disclaim its interest of any kind out of a tract of land described as a total of 3.00-acres, more or less, out of Shady Grove Drive from the east right of way line of Woodland Oaks Drive to the east, all of Long Barrel Lane, all of Ince Lane, from the north right of way line of Machala Lane to the north, all shown on that map or plat known as and out of Woodland Oaks Section Two, an addition in Harris County, Texas according to the map or plat recorded in volume 262, page 136 or plat recorded in volume 262, page 1369, of the records of Harris County, Texas, as per that map or plat of Woodland Oaks Section Two (2) Dedication, dated February 4, 1977, from Oak Glen Building Company and Larkstone Building Company recorded in volume 262, page 136 of the records of Harris County, Texas from Construction of Stormwater Detention Basin at White Oak Bayou and Woodland Trails - E500-24-00-E001 project, tract E100-00-00-15-501.0 - Disclaimer, Precinct 1.
end
Background and Discussion:
The purpose of this disclaimer request is to abandon platted streets owned by Harris County in Woodland Oaks Sec for construction of a stormwater detention basin as part of a Harris County Flood Control project.
Expected Impact:
The proposed project is located within the White Oak Bayou watershed. The project objective is to reduce the existing flood hazard along White Oak Bayou by lowering peak flows and water surface elevations (WSEs).
Alternative Options:
Under the No action alternative, area residents would continue to be affected by area flooding.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any): None
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): 0 Long Barrel Ln, Houston, Tx 77040
Precinct(s): Precinct 1
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 4/16/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Dr. F. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer
Attachments (if applicable): Disclaimer Order with Exhibits and Map