Legislation Details

File #: 25-0947    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/26/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval of a change in contract with Earth Builders LP, in connection with John Paul Landing, North Basin Cell, Phase 3, adding 59 calendar days, with no change in the amount, Job No. 23/0263-2, UPIN 2110330208023, Precinct 4, MWBE Contracted Goal: 29%, MWBE Current Participation: 30.55%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0263, UPIN 2110330208023 

Vendor/Entity Legal Name (if applicable): Earth Builders LP

 

MWBE Contracted Goal (if applicable): 29%

MWBE Current Participation (if applicable): 30.55%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Earth Builders LP, in connection with John Paul Landing, North Basin Cell, Phase 3, adding 59 calendar days, with no change in the amount, Job No. 23/0263-2, UPIN 2110330208023, Precinct 4, MWBE Contracted Goal: 29%, MWBE Current Participation: 30.55%.

end

 

Background and Discussion:

The project involves constructing the third and final phase of the John Paul Landing Detention Basin master plan.  Its goal is to provide a stormwater quality detention pond, achieving the full intended functionality of the basin to enhance drainage and reduce flooding risks.  Additionally, it offers opportunities for natural and man-made amenities, including habitat creation, recreational trails, and future community programming.  The project is located on the eastern edge of the North Basin Cell and runs north-south alongside Langham Creek.

 

The change involves a 59-calendar-day extension to the contract.  The additional time is necessary to complete the final excavation and grading associated with the increased excavation quantities previously added to the contract on Agenda Date: 10.29.24 (Agenda #40 (24-6553)) due to a shortage in the contract excavation quantities, and the excavation required to connect to the main basin.

 

Furthermore, there are several wetland plants and trees remaining to be planted during the designated planting season, which runs from January 15 to March 15, as specified in the project's special provisions under Item 8001.

 

PCO #2 - Time Extension: Days: 59

 

Expected Impact:

The proposed change allows for the addition of extra days to the contract so the project can be completed in accordance with the original intent of the project and in compliance with precinct requests.

 

Alternative Options:

No alternative options.

If no action is taken, the full intended functionality of the Detention Basin master plan will not be achieved. The pond will not be able to provide the proposed drainage improvements to reduce flooding risks.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/05/2023

174 (23-7105)

Contract Award

10/29/2024

40 (24-6553)

Contract Amendment #1 for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/6/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Engineering Department

 

Attachments (if applicable): County Auditor’s Form 1258B