Legislation Details

File #: 26-3116    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/4/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval of an award on the basis of low bid to Ballast Point Construction Inc in the amount of $2,537,235 for construction and reconstruction of sidewalks along South Mason Road for Precinct 4, and for the County Clerk to execute any applicable bonds to be received (260046), MWBE Contracted Goal: 32.46%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 260046

Vendor/Entity Legal Name (if applicable): Ballast Point Construction Inc

 

MWBE Contracted Goal (if applicable): 32.46%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Ballast Point Construction Inc in the amount of $2,537,235 for construction and reconstruction of sidewalks along South Mason Road for Precinct 4, and for the County Clerk to execute any applicable bonds to be received (260046), MWBE Contracted Goal: 32.46%.

end

 

Background and Discussion:

This project consists of approximately 4 miles of sidewalk improvements within the Cornerstones and Memorial Municipal Utility Districts (MUD) areas. The work includes ADA-compliant pedestrian and traffic signal features at all public street intersections, properly sloped driveways, and retaining walls where required due to steep grades behind the curb. Overall, the project enhances transportation accessibility and safety within the project limits.

 

Expected Impact:

Awarding the contract will allow the recommended bidder to proceed with construction. Project is needed to provide alternative mobility and connectivity options that enhance pedestrian and bicycle access within the surrounding neighborhood.

 

Alternative Options:

The alternative is not to award the contract. If no action is taken, the sidewalk and associated improvements will not be constructed.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/26/26

268

Advertisement approved

 

Location:

Address (if applicable): South Mason, from Kingsland Blvd to County Line

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Construction of  Sidewalk - South Mason from Kingsland Blvd to County Line - 2023 for Harris County Precinct 4

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other  1070 - Mobility Fund

$

$2,537,235.43

$2,537,235.43

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$2,537,235.43

$2,537,235.43

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$2,537,235.43

$2,537,235.43

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer; Sheila Rodriguez, Senior Buyer, Purchasing

 

Attachments (if applicable): Letter, Bid Tab