File #: 25-3464    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/27/2025 In control: Commissioners Court
On agenda: 6/12/2025 Final action: 6/12/2025
Title: Request for approval to execute an agreement with Kirksey Architecture, Inc., in the amount of $916,060.00 for Professional Services to Prepare Plans Specifications & Cost Estimate documents in connection with demolition and site grading for the Family Law Center building located at 1115 Congress St, Houston, TX 77002 - Demolition - UPIN 24035MF38F01, Precinct 1, MWBE Contracted Goal: 18.3%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 24035MF38F01

Vendor/Entity Legal Name (if applicable): Kirksey Architecture, Inc.

 

MWBE Contracted Goal (if applicable): 18.3 %

MWBE Current Participation (if applicable): 0 %

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Kirksey Architecture, Inc., in the amount of $916,060.00 for Professional Services to Prepare Plans Specifications & Cost Estimate documents in connection with demolition and site grading for the Family Law Center building located at 1115 Congress St, Houston, TX 77002 - Demolition - UPIN 24035MF38F01, Precinct 1, MWBE Contracted Goal: 18.3%.

end

 

Background and Discussion:

 

The Office of the County Engineer has requested the Prime - Kirksey Architecture to provide design phase documents for the demolition of the Family Law Center Building located at 1115 Congress St, Houston, TX 77002. The Family Law Building was built in 1968, 7-story high rise courthouse building is approximately 106,200 SF. The total cost of the project was estimated to be $10,220,000.

 

Expected Impact:

 

The demolition project will allow for future use in Precinct 1.

 

Alternative Options:

There are no viable alternatives.

 

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/27/2024

130

Approval of Preliminary Investment Memo for the 1115 Congress St - Family Law Center Demolition Project for a total incremental authorization and approval of $1,020,000 for the Harris County Engineering Department for professional architecture and engineering services, UPIN 24035MF38F01.

 

Location:

Address (if applicable): 1115 Congress St, Houston, TX. 77002.

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$916,060

$916,060

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$916,060

$916,060

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$916,060

$916,060

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Dr. Ron Lerner, DBA MScE IAEng LSSBB, Director - HCED/Vertical Construction and Design - High Profile Special Projects

 

Attachments (if applicable): N/A