Legislation Details

File #: 26-0862    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/27/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of a change in contract with Queen Constructors, LLC., in connection with final construction of Harris County Precinct Three for LMI Sidewalks and Trail Project (Phase 2), adding 48 calendar days, with an addition in the amount of $17,997.82, Job No. 24/0161-1, UPIN 22103MF2E801, Precinct 3, MWBE Contracted Goal: 29.72%, MWBE Current Participation: 54.39%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0161, UPIN 22103MF2E801 

Vendor/Entity Legal Name (if applicable): Queen Constructors, LLC

 

MWBE Contracted Goal (if applicable): 29.72%

MWBE Current Participation (if applicable): 54.39%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Queen Constructors, LLC., in connection with final construction of Harris County Precinct Three for LMI Sidewalks and Trail Project (Phase 2), adding 48 calendar days, with an addition in the amount of $17,997.82, Job No. 24/0161-1, UPIN 22103MF2E801, Precinct 3, MWBE Contracted Goal: 29.72%, MWBE Current Participation: 54.39%.

end

 

Background and Discussion:

This project involves the construction of 5-ft wide sidewalks along Huffmeister, between Fleur De Lis and Cypress North Houston, Harris County within Precinct 3.  This project is federally funded by the U.S. Housing and Urban Development Department (HUD) through the Harris County Community Services Department (HCCSD).

 

This final change order is for an addition of the final adjustment in the amount of $17,997.82 and includes quantity adjustments of existing items for final values.

 

Final Adjustment is the reconciliation of actual quantities used in construction against the bid quantities.

 

The final change in contract includes the following:

PCO-3, Proposed Swale/Drainage System = $7,950.00

PCO-4, AT&T Utility Conflict Delay = $0.00, Time: 48 Days

PCO-5, Final Adjustment = $10,047.82

The above additions and deductions result in a net change in the amount of $17,997.82 and 48 calendar days.

 

Expected Impact:

Sidewalks were constructed to enhance safety by providing designated pedestrian spaces and reducing conflicts with vehicles.  They also improve accessibility and promote walking, fostering greater connectivity for Harris County residents.  The final change adds extra days and funds to the contract, ensuring the contractor is paid for the final estimates, including retainage.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will be delayed for payment of their final pay estimates which include the retainage.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/06/2024

291 (24-4856)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other                                   2601, 2699

$

$17,997.82

$17,997.82

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$17,997.82

$17,997.82

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$17,997.82

$17,997.82

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B