Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): S500-02-00-E001
Vendor/Entity Legal Name (if applicable): Texas Department of Transportation
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an advance funding agreement with the Texas Department of Transportation, in the amount of $529,764.35, for voluntary local agreement contributions by the Flood Control District to improve drainage and reduce flood risks in connection with transportation improvement projects with no required match on-system (Luce Bayou Watershed, Bond ID F-108, Project ID S500-02-00-E001, Agreement No. 2022-194, Precinct 3).
end
Background and Discussion:
The Flood Control District is working on a flood damage reduction project in the same area where uncontrolled sheet flow is the main cause of inundation impacting the Commons Area and several roads, including FM2100. It was decided to partner with (Texas Department of Transportation) TxDOT to assist with the construction of an 8’X8’ RCB within TxDOT right-of-way to intercept, redirect and detain the sheet flow within the proposed Flood Control District and TxDOT detention basins. The basins will be interconnected and will have a common outfall to Luce Bayou. TxDOT is constructing most of the structural components such as the RCBs and outfalls for HCFCD using their current construction contract. This Amendment will provide for the additi...