Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): M500-10-00-E002
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC
MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $201,357, to provide additional design, bidding, and construction phase engineering services in support of construction of the Boudreaux Stormwater Detention Basin (Willow Creek Watershed, Bond ID F-106, Project ID M500-10-00-E002, Agreement No. 2024-21, Precinct 3, CDBG-MIT, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 100%).
end
Background and Discussion:
This amendment will allow continued design engineering and environmental professional services for M500-10-00-E002 Boudreaux Stormwater Detention Basin – Phase I. The Flood Control District will construct the project using funding from the CDBG-MIT grant program. This project includes the design of phase 1 of 3 planned phases of a new stormwater detention basin within the Willow Creek watershed. This amendment adds necessary funds for the completion of the Bid Ready design task. Additional design effort was required to redesign from a wet to dry-bottom pond after the 50% submittal. This was due to FAA regulations.
Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the Willow Creek watershed by providing a stormwater...