Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): B509-04-00-E002
Vendor/Entity Legal Name (if applicable): iGET Services LLC
MWBE Contracted Goal (if applicable): 20.54%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with iGET Services LLC, in the amount of $159,575, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E002, Agreement No. 2023-26, Precinct 2, CDBG-DR, MWBE Contracted Goal: 20.54%, MWBE Current Participation: 100%).
end
Background and Discussion:
The proposed Genoa Red Bluff Stormwater Detention (SWD) basins are located within the Armand Bayou (B100-00-00) watershed along Spring Gully (B109-00-00). The site is partially located within the City of Pasadena. The proposed SWD basins are intended to mitigate the future channel improvements from La Porte’s Brookglen Regional Plan, which is a flood risk reduction plan to relieve the repetitive flooding in the Brookglen neighborhood located in La Porte to the north. Phase 1 construction has been completed under B509-03-00-E001. Phase 2 design and construction includes expansion of the detention basin to its full capacity. Project is being funded by the 2018 Bond and CDBG-DR program.
Expected Impact:
This project seeks to reduce flood risks and strengthe...